2.1. Overhead installation
Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and
EN60598-2-17
The suspension devices have to be build and measured so they can withstand for an hour the tenfold
of the payload without suffering a permanent detrimental deformation.
Basically installation has to be made by using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
fall down in case of failure.
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.
The operator is obliged to following safety
-
Before the first start-up or after critical changes before restarting it has to be checked by an
expert.
-
Review in the frame of the inspection test at least all four years by an expert. .
-
Review by a qualified person at least once a year.
How to carry out the overhead installation:
In tidal fall you should install the device out of the lounge area of peop
5 / 32
Overhead installation
Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and
17 Installations are to carry out by skilled personnel only.
devices have to be build and measured so they can withstand for an hour the tenfold
of the payload without suffering a permanent detrimental deformation.
Basically installation has to be made by using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
under elevated work stations or any other danger zones is forbidden.
The operator is obliged to following safety-related and mechanical facilities:
up or after critical changes before restarting it has to be checked by an
Review in the frame of the inspection test at least all four years by an expert. .
Review by a qualified person at least once a year.
How to carry out the overhead installation:
In tidal fall you should install the device out of the lounge area of people
You have to observe the regulations of BGV C1 (formerly VBG 70) and
Installations are to carry out by skilled personnel only.
devices have to be build and measured so they can withstand for an hour the tenfold
Basically installation has to be made by using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
under elevated work stations or any other danger zones is forbidden.
up or after critical changes before restarting it has to be checked by an
Review in the frame of the inspection test at least all four years by an expert. .
Содержание Cobalt X-3 Coupe
Страница 1: ...Cobalt Manual Cobalt X 3 Coupé 3 Coupé ...
Страница 27: ...7 Technical data 7 1 Photometrical data 7 2 Color wheel 27 32 Photometrical data ...
Страница 28: ...7 3 Gobo wheel 1 7 4 Gobo wheel 2 28 32 ...
Страница 30: ...30 32 ...
Страница 31: ...31 32 ...
Страница 32: ...32 32 Importer B K Braun GmbH Industriestraße 2 D 76307 Karlsbad www bkbraun com info bkbraun com ...