15
5.1.1 Installation dimensions and descriptions
Process connection: on the side
Process connection: on the top/bottom
A:
Boiler / Vessel connection dimensions
E:
Visible length / switching range
D:
Minimum water level
t:
Probe distance
5.1.2 Installation
The water column with probes is supplied fully pre-wired.
It is attached via the process connections in accordance with the rules / regulations on the
boiler.
Because of the temperature-dependent density of the medium, it must be
ensured that a flow through the add-on housing with the medium is
ensured, e.g. through a forced circulation (inclination).
Caution
Содержание EWLS
Страница 31: ...31 12 Declaration of conformity...
Страница 33: ...33...
Страница 34: ...34...
Страница 35: ...35...
Страница 36: ...36...