Operating instructions
Through-beam sensor with IO-Link
OGE
OGS
80282420 / 00
01 / 2019
UK
Страница 1: ...Operating instructions Through beam sensor with IO Link OGE OGS 80282420 00 01 2019 UK...
Страница 2: ...3 Functions and features 3 4 Installation 4 5 Electrical connection 4 5 1 Transmitter 4 5 2 Receiver 5 5 2 1 PNP 5 5 2 2 NPN 5 6 Settings 5 6 1 Set via IO Link 5 6 1 1 Set sensitivity with object 6 6...
Страница 3: ...estrictions Only use the product for its intended purpose 3 Functions and features If the operating instructions or the technical data are not adhered to personal injury and or damage to property may...
Страница 4: ...e connected by a qualified electrician The national and international regulations for the installation of electrical equipment must be adhered to Ensure voltage supply to EN 50178 Disconnect power Con...
Страница 5: ...ition it is possible to set the parameters of the unit while it is in operation Operation of the unit via the IO Link interface requires an IO Link master With a PC suitable IO Link software and an IO...
Страница 6: ...each SP1 TP2 in the LR DEVICE software Fig 1 TP1 1 2 Fig 2 1 2 1 transmitter 2 receiver TP1 teach point 1 TP2 teach point 2 Either the object can be set first and then the background or the other way...
Страница 7: ...e green LED is on when the unit is ready for operation 8 Maintenance repair disposal Keep the lens of the sensor free from soiling For cleaning do not use any solvents or cleaning agents which could d...