background image

5

UK

4  Installation

Using process adapters the unit can be adapted to different process connections� 

•  Adapters have to be ordered separately as accessories� 

A correct fit of the unit and ingress resistance of the connection are only en-

sured using ifm adapters�

•  For small flow rates ifm adapter blocks are available�

4.1  Installation location

General

• The sensor tip is to be completely 

surrounded by the medium�

• Insertion depth of the sensor: minimum 

12 mm�

Recommended

• For horizontal pipes: mounting from 

the side�

• For vertical pipes: mounting in the rising 

pipe�

Conditional

• Horizontal pipe /mounting from the bot-

tom: if the pipe is free from build-up�

• Horizontal pipe /mounting from the 

top: if the pipe is completely filled with 

medium�

To avoid

• The sensor tip must not be in contact 

with the pipe wall�

• Do not mount in downpipes that are 

open at the bottom!

Содержание efector 300 SI5010

Страница 1: ...Operating instructions Flow monitors SI5010 704621 01 08 2010 UK...

Страница 2: ...4 3 Mounting operation 6 5 Electrical connection 7 6 Operating and display elements 7 7 Set up and settings for water 8 7 1 Change the switch point optional 8 7 2 High flow adjustment optional 9 8 Add...

Страница 3: ...n prior to set up of the unit Ensure that the product is suitable for your application without any restrictions The unit conforms to the relevant regulations and EC directives Improper or non intended...

Страница 4: ...ng status changes if the value SP minus hysteresis is reached The hysteresis changes with the flow speed and it is essentially influenced by the set monitoring range It is 2 5 cm s for the setting 5 1...

Страница 5: ...lation location General The sensor tip is to be completely surrounded by the medium Insertion depth of the sensor minimum 12 mm Recommended For horizontal pipes mounting from the side For vertical pip...

Страница 6: ...rces of interference 4 3 Mounting operation Ensure that the system is free of pressure during installation Ensure that no media can leak at the mounting location during installa tion Grease the thread...

Страница 7: ...4 2 1 3 4 1 3 2 Teach L L OUT1 Data OUT1 Data switching signal for flow limit value and data channel for bidirectional communication Teach input for teach signal 6 Operating and display elements 1 Ope...

Страница 8: ...2 3 Your normal flow exceeds the representation range of the display LED 9 flashes Carry out high flow adjustment 6 2 You can restore the factory setting any time 8 3 7 1 Change the switch point optio...

Страница 9: ...you should additionally adapt the unit to the minimum flow Note The following adjustment must only be carried out after the high flow adjust ment Let the minimum flow circulate in the installation or...

Страница 10: ...adapt the unit to new flow conditions any time Apply the operating voltage for 5 10 s to Pin 2 high flow adjustment Apply the operating voltage for 10 15 s to Pin 2 low flow adjustment This adjustment...

Страница 11: ...the representation range LED 0 flashes current flow far below the represen tation range Interference indicator Short circuit at the switching output The operating indicator and red LEDs light alterna...

Страница 12: ...13 Technical data Application area Liquids and gases Operating voltage V 19 36 DC1 Current rating mA 250 Short circuit protection pulsed reverse polarity overload protection Voltage drop V 2 5 Curren...

Страница 13: ...ating IP 67 Protection class III Shock resistance g 50 DIN IEC 68 2 27 11 ms Vibration resistance g 20 DIN IEC 68 2 6 55 2000 Hz Housing materials stainless steel 316L 1 4404 stainless steel 304 1 430...

Отзывы: