GRAND-C422-20D-H
Page 27
WARNING:
The following instructions should only be performed by an authorized and
trained technician.
Before starting, please ensure that you turn off the GRAND-C422-20D-H,
disconnect the power adaptor, network cable(s), and also remove any other
device/cable that is attached to the server.
Take Anti-Static precautions whenever maintenance is being carried out on
the system components. Failure to take anti-static precautions can cause
permanent system damage. For more details on anti-static precautions,
please refer to
Section 3.1
4.1 Component Replacement Procedure
WARNING!
Users are not advised to attempt to repair or replace any internal or external
components of the GRAND-C422-20D-H storage server other than those
listed below. If any other components fail or need replacement, contact the IEI
reseller or vendor you purchased the GRAND-C422-20D-H from or contact an
IEI sales representative directly. To contact an IEI sales representative,
please send an email to
The industrial server components listed below can all be replaced if they fail:
Expansion cards (see
Section 3.3
Hard disk drives (see
Section 3.4
DIMM modules
Power supply units
Содержание GRAND-C422-20D-H
Страница 2: ...GRAND C422 20D H Page ii Revision Date Version Changes November 11 2019 1 00 Initial release...
Страница 9: ...GRAND C422 20D H Page 1 Chapter 1 1 Introduction...
Страница 19: ...GRAND C422 20D H Page 11 Chapter 2 2 Unpacking...
Страница 22: ...GRAND C422 20D H Page 14 Chapter 3 3 Installation...
Страница 34: ...GRAND C422 20D H Page 26 Chapter 4 4 Maintenance...
Страница 39: ...GRAND C422 20D H Page 31 Appendix A A Regulatory Compliance...
Страница 44: ...GRAND C422 20D H Page 36 Appendix B B Safety Precautions...
Страница 49: ...GRAND C422 20D H Page 41 Appendix C C Hazardous Substances Disclosure...