4
Directory
1.1 Features..................................................................................................................................................................................1
1.2 Composition.......................................................................................................................................................................... 1
1.3 Working Principles................................................................................................................................................................1
1.4 Technical Parameters............................................................................................................................................................ 2
1.5 Cutting Head.........................................................................................................................................................................3
1.6 TK4S Cutting Tools............................................................................................................................................................. 4
1.7 TK4S Direction Information................................................................................................................................................7
1.8 List of Tools......................................................................................................................................................................... 8
2.1 Installation Location............................................................................................................................................................10
2.2 Personnel............................................................................................................................................................................. 10
2.3 Power Requirement.............................................................................................................................................................10
2.4 Environmental Conditions.................................................................................................................................................. 11
2.5 Basic Device Compressed Air............................................................................................................................................ 11
2.6 Flooring Space Requirement...............................................................................................................................................11
2.7 Operation Space Requirement.............................................................................................................................................11
3.1 Opening and Inspecting Packing Crates............................................................................................................................. 12
3.2 Setting Up the Base Frame Structure..................................................................................................................................13
3.3 Assemble the Cutting Beam................................................................................................................................................16
3.4 Installing the Vacuum Plates.............................................................................................................................................17
3.5 Leveling the Table Plate....................................................................................................................................................19
3.6 Advertising Industry: Installing the Regional Air Valves and PVC Pipes Images...........................................................22
3.7 Assemble the X Axis Side Covers.................................................................................................................................... 26
3.8 Pneumatic Control.............................................................................................................................................................28
3.9 Connecting the Electric Box............................................................................................................................................. 30
3.10 Assemble main cable etc.................................................................................................................................................31
3.11 Install the Conveyor Belt Guide Rollers Device............................................................................................................ 32
3.12 Install the AKI Device.....................................................................................................................................................35
3.13 Other Cables Function of Instructions............................................................................................................................ 36
3.14 Assemble the Workstation.............................................................................................................................................. 38
3.15 Install the Conveyor Belt................................................................................................................................................ 40
3.16 Tension the Conveyor Belt..............................................................................................................................................42
3.17 Assemble the Milling Support Device............................................................................................................................43
3.18 Install the Covers of The Front and Rear Side................................................................................................................48
3.19 Circuit Boards....................................................................................................................................................................49
4.1 Danger Area On the Module Carriage.............................................................................................................................. 50
4.2 Safety Device On the Machine and PC Table.................................................................................................................. 51
5. Cutting Head Installation...............................................................................................................................................................52
6. Tool Installation.............................................................................................................................................................................54
7. Operation....................................................................................................................................................................................... 60
Содержание TK4S
Страница 1: ...1...
Страница 19: ...15 3 2 3 Connecting the Pause cables...
Страница 22: ...18 3 3 2 On the basis of frame work assemble the aluminum table Aluminum table...
Страница 31: ...27...
Страница 37: ...33 Installing steps of the front 1 2 3 4 5 6 7 8 Installing steps of the rear side 1 2 3 4 5 6 7...
Страница 47: ...43 3 17 Assemble the Milling Support Device 3 17 1 Regular the Milling support device The total height 2 8 m...
Страница 48: ...44...
Страница 50: ...46 3 17 2 Large table milling support device The total height 2 8 m...
Страница 51: ...47...
Страница 52: ...48 3 18 Install the Covers of The Front and Rear Side...
Страница 55: ...51 4 2 Safety Device On the Machine and PC Table 1 Pause Switch 3 Emergency Stop Switch 2 Protective System...