![IECHO TK4S Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/iecho/tk4s/tk4s_user-manual_3786369016.webp)
12
3. Installation
3.1 Opening and Inspecting Packing Crates
Note:
Prevent the crate cover from warping when placed at an
angle. Place the packing crate level.
Note:
•
Only complete the installation if all parts are present and undamaged.
•
Inform IECHO customer service if any parts are missing or damaged.
•
Replenish or replace missing or damaged parts.
A
Remove all screws on the upper side of the packing crate.
B
Remove the cover and place it to one side.
C
Remove the screws from the upper crossbars
D
Remove the crossbars and place them to one side
E
Loosen the screws of the side cover.
F
Remove the side cover.
G
Make sure the contents are complete and without damage.
Содержание TK4S
Страница 1: ...1...
Страница 19: ...15 3 2 3 Connecting the Pause cables...
Страница 22: ...18 3 3 2 On the basis of frame work assemble the aluminum table Aluminum table...
Страница 31: ...27...
Страница 37: ...33 Installing steps of the front 1 2 3 4 5 6 7 8 Installing steps of the rear side 1 2 3 4 5 6 7...
Страница 47: ...43 3 17 Assemble the Milling Support Device 3 17 1 Regular the Milling support device The total height 2 8 m...
Страница 48: ...44...
Страница 50: ...46 3 17 2 Large table milling support device The total height 2 8 m...
Страница 51: ...47...
Страница 52: ...48 3 18 Install the Covers of The Front and Rear Side...
Страница 55: ...51 4 2 Safety Device On the Machine and PC Table 1 Pause Switch 3 Emergency Stop Switch 2 Protective System...