![IECHO TK4S Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/iecho/tk4s/tk4s_user-manual_3786369021.webp)
17
3.4 Installing the Vacuum Plates
Note:
The bracing tube and vacuum plates are labeled. The order must be followed! The label must
always be positioned at the front!
Attaching bracing tube X1 :
Place bracing tube X1 to X5
The two end of the square pipe extended
120mm long from the aluminum frame
Tighten the screws(M8x12mm)
and washer.
Aluminum tubes
Screws
Содержание TK4S
Страница 1: ...1...
Страница 19: ...15 3 2 3 Connecting the Pause cables...
Страница 22: ...18 3 3 2 On the basis of frame work assemble the aluminum table Aluminum table...
Страница 31: ...27...
Страница 37: ...33 Installing steps of the front 1 2 3 4 5 6 7 8 Installing steps of the rear side 1 2 3 4 5 6 7...
Страница 47: ...43 3 17 Assemble the Milling Support Device 3 17 1 Regular the Milling support device The total height 2 8 m...
Страница 48: ...44...
Страница 50: ...46 3 17 2 Large table milling support device The total height 2 8 m...
Страница 51: ...47...
Страница 52: ...48 3 18 Install the Covers of The Front and Rear Side...
Страница 55: ...51 4 2 Safety Device On the Machine and PC Table 1 Pause Switch 3 Emergency Stop Switch 2 Protective System...