Confidential Information - Do Not Distribute
part, where the wind turbine body will be installed (see
reference).
Fig. 84 – Wind cable installed in the pole
10.
Join the pole pieces with the metallic joint (
), fasten M10 screws
to block the two metallic pipes;
Fig. 85 – Metallic pole joint
11.
Insert the pole into the holder located at the base of the trailer and
extract the support leg of the pole to maintain the pole lifted in
horizontal position;
12.
With an Allen key and spanner, secure the pole to its base holder
fastening the fraying protection screw;
Fig. 86 – Secure the pole to its base holder
13.
Plug the white connector coming out from the Wind Turbine with the
Wind cable white connector coming out from the pole top (
).