T
H E
P O W E R
F A M I L Y
(C) IDM ENERGIESYSTEME GMBH
Installation instructions Terra CL
27
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
Interior installation
In
te
rio
r ins
tall
a
tio
n
5.12. Conversion from left to right-side connection
The larger CL and also all CL - HGL ma-
chines need no other pipe clamp. It's also
not necessary to shorten the thread rod.
You only have to turn the connection by
180°.
The TERRA CL HGL is pre-fi tted with left-hand side
connection openings. The connection side can be
changed if required. The following steps are required
to do this:
Remove the panels on the left and
the right-hand side by unfastening
the eight respectively four screws.
Remove the central bar and the
assembly angle by unscrewing the
clamping screws above and below.
Converting the hydraulic pipework CL08-10 BA
For converting the hydraulic pipework remove the
left-hand side pipework and the cable fi ttings.
2
3
4
1
To remove the pipework unfasten the pipe clamps
(2) and the connection angle (3) on the plate heat
exchanger. Turn the upper elbow joint by 180° and
tighten again (according to the picture). Tighten the
fi xing clips and threaded rods. Install the circulation
pump and turn the pump head back.
The heating side connection of the elec-
trical heater may not be exposed to hea-
vy tension!
For the upper pipework remove the copper extension
pipe (1) at the connection (4). The heating side con-
nection is carried out directly on the electrical heater.
Mount the thread rod in the provided tap hole on the
right side of the base plate. To fi x the upper pipework
you have to shorten the upper thread rod. So you can
fi x the pipework with the thread rod and the provided
pipe clamp (54 - 59mm) on the electical heater.
Re- fasten all connecting cables using the cable bin-
der. Then re-fi t the panels onto the opposite side.