Installation instructions Terra CL

27

1

2

3

4

5

6

7

8

9

10

11

12

13

1

2

3

4

5

Interior installation

In

te

rio

r ins

tall

a

tio

n

5.12. Conversion from left to right-side connection

The larger CL and also all CL - HGL ma-

chines need no other pipe clamp. It's also 

not necessary to shorten the thread rod.

You only have to turn the connection by 

180°.

The TERRA CL HGL is pre-fi tted with left-hand side 

connection openings. The connection side can be 

changed if required. The following steps are required 

to do this:

Remove the panels on the left and 

the right-hand side by unfastening 

the eight respectively four screws. 

Remove the central bar and the 

assembly angle by unscrewing the 

clamping screws above and below.

Converting the hydraulic pipework CL08-10 BA

For converting the hydraulic pipework remove  the 

left-hand side pipework and the cable fi ttings.

2

3

4

1

To remove the pipework unfasten the pipe clamps  

(2) and the connection angle (3) on the plate heat 

exchanger. Turn the upper elbow joint by 180° and 

tighten again (according to the picture). Tighten the 

fi xing clips and threaded rods. Install the circulation 

pump and turn the pump head back.

The heating side connection of the elec-

trical heater may not be exposed to hea-

vy tension!

For the upper pipework remove the copper extension 

pipe (1) at the connection (4). The heating side con-

nection is carried out directly on the electrical heater.

Mount the thread rod in the provided tap hole on the 

right side of the base plate. To fi x the upper pipework  

you have to shorten the upper thread rod. So you can 

fi x the pipework with the thread rod and the provided 

pipe clamp (54 - 59mm) on the electical heater.

Re- fasten all connecting cables using the cable bin-

der. Then re-fi t the panels onto the opposite side.

Содержание TERRA CL 08-33 - HGL/BA

Страница 1: ...hwater technology THE POWER FAMILY w w w i d m e n e r g i e c o m Technical documentation Installation instructions TERRA CL 08 33 HGL BA 400V TERRA CL 08 33 HGL P BA P 400V reversible for cooling wi...

Страница 2: ...7 Installation space 13 5 8 Corner installation 14 5 8 1 Space Required and Accessibility 14 5 8 2 Customer preparation 15 5 8 3 Accessories for corner installation 16 5 8 4 Assembly Instructions Cor...

Страница 3: ...Terra CL HGL P heat pump with process reversal for cooling and IDM Hygienik with separation plate 36 7 8 Terra CL BA P heat pump with process reversal for cooling and IDM Hygienik with separation plat...

Страница 4: ...hat the site of the heater is situated as far as possible from noise sensitive living areas A noise insulating door should be fitted door Construction drying and screed heating The heat pump is not de...

Страница 5: ...act 1 4 Scope of deliver y Heat pump unit with suction gas cooled scroll compressor Stainless steel plate heat exchanger as condenser Finned tube Al Cu evaporator package Speed controlled radial fan S...

Страница 6: ...G R 1 AG R 1 AG R 1 AG Max flow temperature C 55 55 55 55 55 55 55 55 Max operational pressure bar 3 3 3 3 3 3 3 3 Min heating circuit water volume l h 1500 1800 2200 2650 3550 4200 5250 5650 Pressure...

Страница 7: ...required Design 3 Design The dimensioning of an air water heat pump should be such that the bivalence point is between 3 and 10 C This will help ensure that more than 90 of the annual heating requirem...

Страница 8: ...CL 12 CL 15 CL 33 CL 20 CL 25 CL 30 0 5 10 15 20 25 30 35 40 45 20 15 10 5 0 5 10 15 20 4511 4511 EN1 EN1 W35 W35 EN1 Outsidetemperature C Heating capacity kW CL 08 CL 10 CL 12 CL 15 CL 33 CL 20 CL 25...

Страница 9: ...allation instructions Terra CL 9 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 CL 08 CL 10 CL 12 CL 15 CL 33 CL 20 CL 25 CL 30 0 5 10 15 20 25 30 35 40 45 20 15 10 5 0 5 10 15 20 4511 4511 EN1 EN1 W55 W55 EN1 H...

Страница 10: ...nsor lines 3 Control lines CL 12 15 heating return 4 Heating return CL 12 15 control lines 5 Condensation run off Typ b h t a d e f g i j k l m 8 1100 1535 750 640 865 690 1035 575 460 350 240 125 125...

Страница 11: ...4 3 Intake box optional accessories The control cabinet contains the complete heat pump control system It is separate from the heat pump mounted on a suitable wall with the frame screws provided The...

Страница 12: ...ensation run off Air source heat pumps generate condensation during operation With larger machines up to 50l of water can be extracted from the ambient air per day The condensation run off should be c...

Страница 13: ...ition of the sound waves means that noise level can increase up to 3 dB 5 7 Installation space The TERRA heat pumps should be installed in a frost proof room Room temperature should be between 5 C and...

Страница 14: ...enings must be insu lated with closed pore insulating material minimum thickness 50 mm 5 8 1 Space Required and Accessibility To guarantee maintenance and operation of the heat pump the following mini...

Страница 15: ...the wall insulation is 50 mm 5 8 2 Customer preparation Exhaust air opening to right Exhaust air opening to left An even solid installation surface must be selected After positioning the heat pump it...

Страница 16: ...n then be affixed flush with the external edge of the heat pump Additionally the horizontal elements are also lined on the front This will help ensure an optimum seal Before the machine is positioned...

Страница 17: ...do this Option 1 Option 2 This method is used if there are no two external walls available As a short circuit may occur between the supply and exhaust sides with this method the inlet and outlet shoul...

Страница 18: ...426 Pos 427 428 Interior installation Interior installation 5 9 1 Accessories Standard air duct Option 1 Option 2 Pos 341 Wall connection intake Pos 421 Outlet panel right left Pos 423 Duct 1000 mm P...

Страница 19: ...100 12 1100 930 500 700 650 770 1100 15 1100 930 500 700 650 770 1100 TERRA CL 08 15 All dimensions in mm Standard duct Version 1 90 for 1000 mm duct length length can be cut to size as required Inter...

Страница 20: ...0 650 720 1100 270 12 1100 930 500 700 650 770 1100 270 15 1100 930 500 700 650 770 1100 270 TERRA CL 08 15 All dimensions in mm Standard duct Version 2 180 for 1000 mm duct length length can be cut t...

Страница 21: ...uneven this can be corrected using the adjustable machine feet The heat pump may only be moved with the panels fitted Significant pressure against the wall should be avoided If two or more ducts are a...

Страница 22: ...a CL 22 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 Interior installation Interior installation 5 10 Installation Flexible air hose This option is suitable for connecting to air openings at varied heights...

Страница 23: ...1000 830 620 620 650 1000 12 1100 930 720 720 650 1000 15 1100 930 720 720 650 1000 All dimensions in mm Flexible hose lateral TERRA CL 08 15 Interior installation Interior installation 5 10 1 Custome...

Страница 24: ...Pos 382 Pos 344 Interior installation Interior installation 5 10 2 Accessories Flexible air hose Pos 341 Wall connection intake Pos 381 Outlet panel right left Pos 3861 Insulated air hose 5 m Pos 3862...

Страница 25: ...g prepared by the customer has been insulated The heat pump may only be moved with the panels fitted Significant pressure against the wall should be avoided If there are any air gaps on the outlet or...

Страница 26: ...allation 5 11 Flexible air hose with air intake box Pos 381 Outlet panel right left Pos 3861 Insulated air hose 5m Pos 3862 Insulated air hose 3m Pos 3863 Insulated air hose 2m Pos 383 Wall flange Pos...

Страница 27: ...For converting the hydraulic pipework remove the left hand side pipework and the cable fittings 2 3 4 1 To remove the pipework unfasten the pipe clamps 2 and the connection angle 3 on the plate heat...

Страница 28: ...laid so that the water can also flow off even at outside temperatures below 0 C A heatable siphon should be fitted Alternatively an electrical self regulating heating cable can be used that is selecte...

Страница 29: ...01 Pos 301 Pos 302 Pos 303 Pos 306 Exterior installation Exterior installation 6 2 Distances Type TERRA CL A B C D E 08 10 750 1100 190 150 125 12 15 780 1200 20 880 1200 25 33 980 1300 6 3 Accessorie...

Страница 30: ...heating systems which are not diffusion tight corrosion may occur on steel parts when using steel pipes steel radiators or storage tanks due to oxygen diffusion Corrosion products can be deposited in...

Страница 31: ...mp see installation instructions flow meter 7 2 Terra CL HGL heat pump with IDM Hygienik with separation plate During the priority charging procedure the top area of the storage tank is charged with t...

Страница 32: ...ion 7 3 Terra CL HGL heat pump with IDM Hygienik and heating buffer The Hygienik is only used to prepare tapwater and during the priority charging procedure is charged with a speed controlled charging...

Страница 33: ...M41 M32 2 M42 B52 B62 B33 B42 B1 M22 HW CW RE A FS OS RE B FS Terra CL Hygienik HC A HC B Heating Side Connection Heating Side Connection When using a flow meter to measure the heat volume the sensor...

Страница 34: ...rra CL BA heat pump with Hygienik and without separation plate and heating buffer For larger systems over approx 27kW with either significant hot water consumption or a very low hot water consumption...

Страница 35: ...42 B52 B62 B42 B1 M22 HW CW FS OS FS Also possible to include in front of the priority valve Terra CL Hygienik Oil gas burner RE B RE A HC B HC A Heating Side Connection Heating Side Connection 7 6 Te...

Страница 36: ...ling and Hygienik with separation plate T T T T M M M B A P T rH T CL T T M M T T T Hygienik TerraCL RG B RG A HK A HK B VF VF K hlventil AF WW KW SPF K hl ventil K hl ventil K ltepuffer B61 B51 B52 B...

Страница 37: ...th separation plate T T T T T T M M M B A P T rH T CL T M M M T Hygienik TerraCL RG B RG A HK A HK B VF VF K hlventil AF WW KW SPF Schichttrennplatte K hl ventil K hl ventil K ltepuffer B61 B51 B52 B6...

Страница 38: ...sential that a fuse design is used C or K characteristic The relevant cable cross section must be determined by the electrician All systems are equipped with a start up current limiter The heat pump i...

Страница 39: ...GSM module Central processing unit H8 F6 F1 F2 H4 F8 F4 F5 H7 F10 H6 F3 H5 H1 H3 H2 SD Card Electrical connection Electrical connection 8 2 Connection Diagram Electrical Components The central unit of...

Страница 40: ...with the electric wiring diagram enclosed with the heat pump 8 4 Connection lines control cabinet heat pump Connection line electric heating The supply line for the electric immersion heater can be c...

Страница 41: ...ndesirable fault currents which can have different effects The effects on biological systems can only be guessed at currently but the effects on technical electrical sys tems are measurable and in the...

Страница 42: ...ontained in the scope of delivery or are already installed and in any case required Air heat exchanger sensor B72 Heat pump flow sensor B33 HGL flow sensor B35 only for the HGL design Buffer tank sens...

Страница 43: ...nected as three pole according to the wiring diagram enclosed Mixer open brown Mixer closed black 8 11 System Earthing When the protective conductor is connected correctly the electrical panel and the...

Страница 44: ...s period If the heat pump is to be drained on the heating side for frost protection the connection hose on the heat pump return plate heat exchanger must be unfastened 9 1 1 First switch on of the hea...

Страница 45: ...TH E P OW E R FA M I L Y C IDM ENERGIESYSTEME GMBH Installation instructions Terra CL 45 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 Commissioning Commissioning...

Страница 46: ...T H E P OW E R FA M I L Y C IDM ENERGIESYSTEME GMBH 9 Allgemeine Beschreibung Installation instructions Terra CL 46 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 Commissioning Commissioning...

Страница 47: ...considered analogously EN 378 EN 60529 EN ISO 12100 1 2 EN ISO 13857 EN 349 EN 60335 1 2 40 EN 55014 1 2 EN 60204 1 EN 61000 3 2 Concerning following products Direct evaporation heat pumps TERRA DE HG...

Страница 48: ...n our website www idm energie com IDM Academy PRACTICAL KNOWLEDGE FOR SALES AND TECHNOLOGY The comprehensive range of seminars for specialists at the IDM POWER FAMILY is available to you at all times...

Отзывы: