Installation instructions Terra CL
25
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
Interior installation
In
te
rio
r ins
tall
a
tio
n
5.10.3. Assembly instr uctions – Flexible air hose
Air Inlet Side
The inlet-side wall connection is supplied separately.
Vertical connections must be affi xed fi rst. To do this,
simply remove the fi lm on the rear. The cellular rubber
can then be affi xed fl ush with the external edge of the
heat pump.
Additionally the horizontal elements are also lined on
the front. This will help ensure an optimum seal.
Before the machine is positioned on the inlet opening,
check that the wall opening prepared by the customer
has been insulated.
The heat pump may only be moved with
the panels fi tted.
Signifi
cant pressure against the wall
should be avoided.
If there are any air gaps on the outlet or inlet openings
due to the ground being uneven, this can be corrected
using the adjustable machine feet.
Outlet panels:
The outlet panel is mounted using the four clamps
supplied.
Wall fl ange:
The wall fl ange must be fi tted to the air outlet opening
using suitable mounting materials. There are four bore
holes at the corners of the fl ange for this purpose.
Hose:
The hose can be cut to any size required. For con-
necting the two fl anges, the hose insulation is pushed
together at both ends.
The hose is fi tted onto the fl ange using a hose clamp.
The insulation can then be pushed back onto the
fl ange.
The air hose should be supported by a
bracket every 0.5 m.