background image

Installation 

X- Smart Pro 

V 2.0 

18 

 

 

 

 

Installation 

 

4.1 

Unpacking the machine 

 

Remove the cardboard 

 

1.  Remove the straps. 

2.  Remove the cardboard (A). 

 
 
 
 
 
 
 
 
 
 
 
 

 

Remove the plastic transportation parts 

 

1.  Remove the plastic (seal plastic). 

2.  Remove the foam. 

 
 
 
 

 

A

 

Содержание X-Smart Pro

Страница 1: ...Original Manual X Smart Pro www fluidman com V 2 0 www fast fluid com...

Страница 2: ...tion of Fast Fluid Management B V to notify any person of such revision or change Details and values given in this manual are average values and have been compiled with care They are not binding howev...

Страница 3: ...e 9 3 1 3 Type plate serial number 9 3 1 4 Type plate details 10 3 2 Operation 10 3 2 1 General dispensing procedure 10 3 2 2 Placing a can 11 3 3 Maintenance 11 3 3 1 General cleaning after every dis...

Страница 4: ...tents V 2 0 4 6 Technical data 20 6 1 General specifications 20 6 2 Dimensions and mass 20 6 3 Ambient conditions 20 6 4 Noise level 21 6 5 Safety classifications 21 6 6 Electrical specifications 21 6...

Страница 5: ...language of the manual is English All other language versions are translations of the original instructions 1 1 How to work with the manual 1 To familiarize yourself with the structure and content 2 T...

Страница 6: ...in this manual Connect the machine to a grounded wall socket Do not use extension cords of inadequately rated power cables Make sure that the power cable is freely accessible Do not place objects on...

Страница 7: ...ty symbols on the machine Rotating parts hazard Electrical hazard Read the manual Instruction 2 5 Safety symbols in the manual Warning Can cause personal injury Caution Can cause damage to the machine...

Страница 8: ...V 2 0 8 3 Operator manual 3 1 Description 3 1 1 Overview of the machine J I H G F A B C D A Front door F Brush container B Emergency stop switch G Pump with nozzle C Shelf holder H Canister D Can tabl...

Страница 9: ...Operator manual X Smart PRO V 2 0 9 C A B 3 1 2 Overview of the machine A Machine status leds B Can sensor C Display glass 3 1 3 Type plate serial number...

Страница 10: ...machine is operational you hear beep beep Status lights will light up Caution Do not remove the power from the machine The machine must stir the colorants periodically 3 2 1 General dispensing procedu...

Страница 11: ...eight of the can table depends on the height of the can 2 Place the can table A in the correct slots for the correct height Caution Make sure that the can table is secure 3 Place the can B at the cent...

Страница 12: ...gives you a clear overview of the maintenance tasks and a reminder to keep your machine in optimal condition Replace the brush unit C every 4 months for optimal performance Use the X Smart Pro paper f...

Страница 13: ...rush unit is installed in a bracket with a click connection It is advised to replace the brush unit every 4 months to ensure optimal performance Replacement brush units are provided in the X Smart Pro...

Страница 14: ...is used 8 Slide the brush unit A back in the bracket B Note The brush unit is properly connected to the bracket when you feel a snap fit Make sure you hear the click sound 3 3 4 Cleaning the nozzles d...

Страница 15: ...s when you need to refill a canister 1 In the dispense software start the fill canister command Note The fill canister command of the dispense software controls the motor of the turntable The turntabl...

Страница 16: ...o not use the emergency stop switch as an on off function 2 Solve the problem as quickly as possible Caution When the machine is shut down the stirring mechanism which is necessary to keep the coloran...

Страница 17: ...art Pro V 2 0 18 4 Installation 4 1 Unpacking the machine Remove the cardboard 1 Remove the straps 2 Remove the cardboard A Remove the plastic transportation parts 1 Remove the plastic seal plastic 2...

Страница 18: ...ne in position 4 2 1 Move the machine to the final position Warning Mind the minimum requirements of the load capacity of the floor See Dimensions and mass on page 20 Note Make sure that the final loc...

Страница 19: ...machine To turn on the machine 1 Connect the power cable to the wall socket When the machine is operational you hear two beeps 2 Make sure that the emergency stop switch is released 3 Make sure that...

Страница 20: ...anufacturer See www fast fluid com Fast Fluid Management Europe and Asia or www fluidman com Fluid management U S A 5 3 Troubleshooting guide Problem Possible cause Possible solution Main power supply...

Страница 21: ...mL step Maximum flow rate L min 0 25 Minimum dispense ml 0 077 Nozzle diameter mm 4 Turntable Uni directional 6 2 Dimensions and mass Parameter Specifications Dimensions height x width x depth cm 123...

Страница 22: ...ecifications Temperature C operational 10 to 40 Temperature C out of operation 25 to 55 Altitude above sea level m operational 10 to 2000 Altitude above sea level m out of operation 10 to 12000 Parame...

Страница 23: ...s Parameter Specifications IP Ingress Protection classification 32 EMC Electromagnetic Compatibility classification Class B Over voltage category Class II 6 6 Electrical specifications Parameter Speci...

Страница 24: ...OFT 2 EMERGENCY HARD 3 RED ORANGE BLUE YELLOW CANSENSOR 1818952 5V 1 SOFT 2 HARD 3 SUPPLY 110 230VAC 50 60Hz 1 5Amax FUSE 2 x 5AT POWER UNIT 1818903 EMERGENCYSWITCH M AGIT MOTOR 1818917 M TABLE MOTOR...

Страница 25: ...Manufactured by IDEX Fluid Metering Pvt Ltd Survey no 256 GIDC Manjusar Savli Dist Vadodara 391 770 India...

Отзывы: