background image

0900885 Rev: REL (02/06) 

Page 11 of 12 

LABEL CHANGE PROCEDURE 

(1)  Shut off power to the system. 

(2)  Remove screws that hold the LFP circuit board to the front panel of the control box. 

(3)  Disconnect ribbon cable from the LFP circuit board. 

(4)  Use 2 of the screws to temporarily hold the board onto the front panel while changing the label. 

(5)  Carefully remove old label. Start by prying up on a corner with a sharp edge blade. Use of a heat gun may be 

helpful to loosen the adhesive. 

(6)  Clean old adhesive from the front panel with alcohol in preparation for adhering the new label. 

(7)  Carefully remove the backing paper from the new label. Route the ribbon cable through the slot in the front panel 

and adhere the label in place using the keyhole and LFP window for proper alignment. 

(8)  Push out any air bubbles that may have gotten trapped while attaching the new label. Work from the middle 

region of the label to outer edges. 

(9)  Remove the 2 screws that were temporarily holding the LFP circuit board in place and attach the ribbon cable. 

(10) Re-attach the LFP circuit board back on the front panel using all mounting screws. 

(11) Turn power to system back on. 

(12) Test each button of the new label to ensure proper function. 

Содержание Knight ILCS EDGE

Страница 1: ...0900885 Rev REL 02 06 Page 1 of 12 ILCS EDGE System Installation Manual...

Страница 2: ...am 10 Label Change Procedure 11 Warranty Information 12 Knight Locations 12 CAUTION Wear protective clothing and eyewear when dispensing chemicals or other materials Observe safety handling instructio...

Страница 3: ...0900885 Rev REL 02 06 Page 3 of 12 S...

Страница 4: ...ce for installing system components A Power Supply Isolates high voltage system operating power from the control box The power supply box contains a transformer and electrical noise filter for added p...

Страница 5: ...0900885 Rev REL 02 06 Page 5 of 12 SYSTEMDIAGRAM B A C D E...

Страница 6: ...dequate air flow Water Service system requires ambient water service to flush manifold if so equipped Recommended minimum 25 PSI flow pressure Familiarize yourself with all applicable safety electrica...

Страница 7: ...to chemical and no more than 6 ft above chemical container 4 Connect pickup line to input side of pump 5 Connect discharge line between output side of pump and point of injection If using a flush man...

Страница 8: ...port of the manifold This will leave 7 ports remaining for chemical pumps 4 Plugs should be installed in any of the unused ports of the manifold 5 Mount manifold to wall using appropriate hardware 6...

Страница 9: ...nt signal commons see details below Splitting Signal Commons Shut off all power sources before continuing If you have one signal common typical connect it to COM A only If you have two signal commons...

Страница 10: ...Page 10 of 12 0900885 Rev REL 02 06 SYSTEMWIRINGDIAGRAM...

Страница 11: ...ont panel with alcohol in preparation for adhering the new label 7 Carefully remove the backing paper from the new label Route the ribbon cable through the slot in the front panel and adhere the label...

Страница 12: ...Return Authorization KRA number freight prepaid and found to be defective upon factory authorized inspection Bearings and pump seals or rubber and synthetic rubber parts such as O rings diaphragms sq...

Отзывы: