
42
Ideal Viscount GTE
- Installation, Assembly & Servicing
IMPORTANT
The electrical wiring has been carefully
checked in the factory and the internal
connections of the control panel must not be
modified in any event.
7.1.3 Electrical Connections
The electrical connections shall be made in compliance with the
instructions given in the electrical diagrams supplied with the device
and the guidelines provided in the manual.
Care shall be taken to comply with applicable standards and
regulations. The unit shall be powered by a circuit with an omnipole
switch with an opening distance greater than 3 mm.
The earth connection shall comply with standards in force.
Access to the connecting strip
Unscrew the three fastening screws on the rear of the control panel
and open the panel.
Cable passage
Pass the connecting cables through the two cutouts on the rear of
the boiler and bring them to the front via the cable channels.
Then bring them towards the control panel through the rectangular
openings in the front cover.
12
11 10
9
8 7
6
5
4
VA
S3
T8
T7 T6
T 2 T1
L1 N
230V
50Hz
L
N
A
L
I
VIS5144
Main supply
Connect the main supply to terminals 1, 2 and 3 of the connecting
strip as shown opposite.
Flow switch
Connect the flow switch contact in series to the safety circuit (e.g.
between terminal 5 of the terminal block and burner terminal L1).
3
4
1
2
5
6
7
8
9
10
11
12
L
4
N
ALI
5
6
7
8
9
10
11
12
230 V / 50 Hz
N
L1
T1
T2
T6
T7
T8
S3
VA
VIS5145
3 x 0,75 mm
2
CONTROL PANEL