18
Systemiser SE -
Installation
INSTALLATION
2.
Undo the 2 screws and remove the
boiler bottom panel.
3.
Lift the boiler on to the wall, locating the
CH flow and return pipes and gas pipe
to the service pipes.
Tighten all pipe connections.
17 MOUNTING THE BOILER
REAR FLUE OUTLET
1.
Remove the boiler casing:
a.
Undo the securing screw.
b.
Disengage the casing from the back panel and lift it
from the boiler.
18 CUTTING THE FLUE
Rear Flue Length of 114 to 580mm
Note.
If the optional standoff bracket kit is used
it is essential that 80mm is added to the
measured wall thickness when marking
the flue (to allow for the thickness of the
brackets).
1.
Measure and note wall thickness X.
2.
Add 40mm (1
5/8
") to dimension X and,
measuring from the groove, cut the tube.
IMPORTANT
Measure from the groove marked 'TOP'
not
the larger groove.
3.
To ensure the tube is cut square, mark the
flue all the way round.
4.
Cut to length, using the cardboard support
aid.
5.
Remove the cardboard support and any
burrs.
Содержание Systemiser SE
Страница 1: ......
Страница 31: ...31 Systemiser SE Installation INSTALLATION INSTALLATION 42 PICTORIAL WIRING DIAGRAM...
Страница 57: ...57 Systemiser SE Installation SHORTS LIST OF PARTS 86 SHORT PARTS LIST...
Страница 60: ...60 Systemiser SE Installation 89 BOILER CASING ASSEMBLY SHORT LIST OF PARTS...
Страница 61: ...61 Systemiser SE Installation...