INSTALLATION
12 BURNER CONNECTION
Gas Supply
The gas supply MUST be sized in accordance
with British Gas recommendations.
The Local Gas Authority should be contacted, at
a stage prior to actual installation, for any advice
or information required.
Oil Storage Tank
The oil storage tank, oil supply pipe and
connections to the burner unit MUST comply
with the requirements of BS. 799.
The installation should conform to the
recognised standards of good practice in the
trade and comply with the relevant Codes of
Practice, building Regulations and Local
Authority, Fire and Insurance requirements.
IMPORTANT. The burner head deflector must be
in line with the door insulation as shown
opposite.
Connection, adjustment, start-up and
maintenance. (Refer to the instructions
delivered with the burner)
13 ASSEMBLY
Packaging:
The tables below show the numbers of the packages which
make up the boiler. The packages are listed in the order in
which they are opened for assembly.
Tools required:
(not supplied)
-
Phillips head screwdriver
-
Wide flat screwdriver
-
13 and 17mm spanners
-
hammer
-
Silicone glue
-
JDTE assembly tool
-
Simplified assembly tool
The assembly of any optional devices purchased with the boiler is
described in the instructions supplied with the relevant device.
The list of available optional devices is shown on page 3.
45
45
har5981
125
Deflector
Burner
door
insulation
Stud
tappings
Burner
opening (1)
(1) Different burner openings are available
to suit the burner being fitted.
Burner Door Opening and Fixings
Boiler body delivered loose
- front section
1
1
1
1
1
- intermediate section
3
4
5
6
7
- rear section
1
1
1
1
1
- set of assembly rods
1
1
1
1
1
- accessory package
FD10
FD11
FD12
FD13
FD14
Casing
FD169
FD170
FD171
FD172
FD173
Base Frame
FD31
FD32
FD33
FD34
FD35
Burner Door
1
1
1
1
1
Baffle Pack
ID17
ID17
ID19
ID19
ID19
IMPORTANT NOTE: For models GTE7, GTE8 and GTE9 more baffles are supplied than are required.
Refer to Frames 24 and 25 for the correct quantities and location and discard any extra baffles.
Control Panel
- Standard
FD167
FD167
FD167
FD167
FD167
- Deluxe
FD168
FD168
FD168
FD168
FD168
Boiler
GTE 5
GTE 6
GTE 7
GTE 8
GTE 9
INST
ALLA
TION
For latest prices and delivery to your door visit MyTub Ltd - 0845 303 8383 - www.mytub.co.uk - [email protected]