13
FP14KC-X
JAN 2023
Step 3: Posts & Crossbeams Installations
1)
Position the Main Side Post (w/ Power Unit Mounting Bracket) at the left front corner of the Main Side
Runway. Position the remaining three Sub Posts at the other remaining corners, shown in
Fig. 2
.
2)
Locate the Latch Racks at the back of each Post and remove the
M8 x 12mm
screw & washer
securing
the Latch Rack to the lower section of posts, shown in
Figs 10 & 11
. Set M8 Screws & Washer aside
for reassembly in the follwing steps.
3)
Position Hex Nuts to the top of the Latch Rack
’s threaded studs, shown in
Fig 10
. Ensure the Latch
Rack
’s threaded stud is inserted through the outer top plate hole for each Post.
4)
Carefully position each Post to be centered around the Crossbeam ends while still allowing the Nylon
Slider bolt holes to stay exposed. Bolt Sliders onto each side of the Crossbeam end, using the
M8 x
12mm
Countersink Screws, shown below in
Fig. 11
.
Fig. 10 Fig. 11
5)
Carefully position the Posts towards the Crossbeams ends until the Nylon Sliders contact the Latch
Racks. Raise the Latch Rack above the Nylon Sliders to insert the Latch Rack into the Nylon Slider
’s
slots, shown in
Figs 12 & 13.
Repeat for each Post & Crossbeam end.
Fig. 12 Fig. 13
Post
Latch
Rack
M8 x 12mm
Countersink
Screws
M20
Hex Nuts
M8 x 12mm
Screw & Washer
Latch
Rack
Nylon
Slider
Crossbeam
End
Latch
Rack
Crossbeam
End
Nylon
Slider
Raise Latch Rack
to insert into the
Nylon Sliders.
Содержание FP14KC-X
Страница 5: ...5 FP14KC X JAN 2023 Lift Layout Fig 1...
Страница 27: ...27 FP14KC X JAN 2023 Exploded Views Structure...
Страница 28: ...28 FP14KC X JAN 2023...
Страница 29: ...29 FP14KC X JAN 2023...
Страница 32: ...32 FP14KC X JAN 2023 Exploded View Power Unit PU 220V FP14KCX...