11
FP14KC-X
JAN 2023
5)
Remove cable guide tabs from the underside of each end of Crossbeam, using a hex head screwdriver,
Fig. 6
. Set Cable Guide Tabs & hardware aside for reassembly in the follwing steps.
Fig. 6
6)
Slide the cables from the ends of power-side runway and route the cables though the crossbeams
referring to the routing diagram in
Fig 7
.
Fig 7
CAUTION!
Ensure the Cables are not twisted during routing and routed on the correct pulleys
in Runways.
Cable Guide
Tab
(Underside)
REAR
REAR VIEW
FRONT VIEW
FRONT
Содержание FP14KC-X
Страница 5: ...5 FP14KC X JAN 2023 Lift Layout Fig 1...
Страница 27: ...27 FP14KC X JAN 2023 Exploded Views Structure...
Страница 28: ...28 FP14KC X JAN 2023...
Страница 29: ...29 FP14KC X JAN 2023...
Страница 32: ...32 FP14KC X JAN 2023 Exploded View Power Unit PU 220V FP14KCX...