11
Concord Super Series 4 -
Installation & Servicing
8 SITE ASSEMBLY - 600KW Vertical Boiler
9
SITE ASSEMBLY - 600KW HORIZONTAL BOILER
Note.
1.
To aid the assembly procedure, on the flow &
return manifolds and the flow & return spools, the
flanges are left loose for site welding.
2.
The double M/F elbows (16) are to enable ease of
fit and squareness.
LEGEND
1.
Insulated boiler casing (c/w feet).
2.
80 nom. bore elbow.
3.
Flow manifold (long).
4.
Flow and return headers.
5.
Flexible bellows unit.
6.
Blank flange.
7.
Gas header complete with gas cocks.
8.
Rc 1
1
/
2
union elbows.
9.
Space nipple.
10.
Flow and return spools.
11.
Rc1
1
/
2
elbow.
12.
Space nipple.
13.
Short space nipple.
14.
Main gas cock (not shown).
15.
Rc 2 twin elbow (with two hex bushes).
16.
1
1
/
2
M/F elbow.
17.
Return manifold (short).
Note.
1.
To aid the assembly procedure,
on the flow & return manifolds
and the flow & return spools,
the flanges are left loose for site
welding.
2.
The double M/F elbows (12)
are to enable ease of fit and
squareness.
LEGEND
1.
Insulated boiler casing (c/w feet).
2.
125 nom. bore elbow.
3.
Flow manifold (long).
4.
Flow and return headers.
5.
Flexible bellows unit.
6.
Blank flange.
7.
Gas header complete with gas cocks.
8.
Rc 1
1
/
2
union elbows.
9.
Short space nipple.
10.
Main gas cock (not shown).
11.
Rc 2 twin elbow (with two hex bushes).
12.
1
1
/
2
M/F elbow.
13.
Return manifold (short).
INSTALLATION