6
Installation and Servicing
SECTION 1 - GENERAL
Natural Gas only
Destination Country: AU, NZ
LOGIC+ SYSTEM S
B
oiler
Page
Make and model ......................................................... 6
Appliance serial no. on data badge .......... Front Cover
SEDBUK No. % .......................................................... 5
Controls
Time and temperature control to heating ................. 29
Time and temperature control to hot water ........... N/A
Heating zone valves .................................................29
TRV’s........................................................................ 10
Auto bypass ............................................................. 10
Boiler interlock .......................................................... 10
For .................................................................... all boilers
Flushing
................................................................... 14
Inhibitor .................................................................... 14
Central heating mode
Heat input ...................................................to be calculated
For assistance see Technical Helpline on the back Page
Page
Burner operating pressure ...................................... n/a
Central heating flow temp.
...........measure and record
Central heating return temp. ........measure and record
For combination boilers only
Scale reducer ........................................................... 14
Hot water mode
Heat input ............................................to be calculated
Max. operating burner pressure .............................. n/a
Max. operating water pressure ........ measure & record
Cold water inlet temp ...................... measure & record
Hot water outlet temp. ..................... measure & record
Water flow rate at max. setting
........ measure & record
For condensing boilers only
Condensate drain ..................................................... 27
For all boilers:
complete, sign & hand over to customer
COMMISSIONING CHECKLIST DETAILS
NOTE TO THE INSTALLER: COMPLETE THE COMMISSIONING CHECKLIST AND LEAVE THESE
INSTRUCTIONS WITH APPLIANCE
Содержание LOGIC+ SYSTEM S18
Страница 2: ...2 Installation and Servicing...
Страница 61: ...61 Installation and Servicing...
Страница 72: ......