SCAN
for video
2
3.15 RETURN THERMISTOR REPLACEMENT
1. Isolate and drain down the boiler.
2. Remove the clip from the pump housing and remove the
thermistor.
3. Disconnect the electrical lead from the thermistor.
4. Reconnect the electrical lead to the new thermistor and
reassemble, ensuring that the thermistor is fully engaged
and the clip is correctly located.
Refer to Section
3.2
2
3.16 SPARK GENERATOR REPLACEMENT
1. Disconnect the leads from the spark generator.
2. Gently push up the generator to release the bottom clip
from the gas valve mounting bracket.
3. Lift the spark generator up and out of the bottom retaining
location point.
Refer to Section
3.2
4. Fit the new spark generator and reassemble, ensuring
that the the earth lead is replaced.
43
Installation and Servicing
Section 3 - Servicing
SER
VICING
3.14 BURNER REPLACEMENT
Refer to Section
3.2 & 3.7