2.20 ELECTRICAL CONNECTIONS
Wiring should be 3 core PVC insulated cable, not less than
0.75mm
2
(24 x 0.2mm), and to local and national prevailing
regulations.
Connection must be made in a way that allows complete
isolation of the electrical supply such as a double pole switch
having a 3mm (1/8”) contact separation in both poles. The
means of isolation must be accessible to the user after
installation.
WARNING
. This appliance
MUST
be earthed.
A mains supply of 230Vac ~ 50 Hz is required.
The fuse rating should be 3A. All external controls and wiring
must be suitable for mains voltage.
Wiring external to the boiler MUST be in accordance with the
current Wiring Regulations and any local regulations.
2.21 INSTALLER WIRING
The Logic boiler comes pre-fitted with a mains cable and plug.
This must be connected to a permanent live supply and NOT
switched by thermostats/programmers. If the supply cord is
damaged, it must be replaced by the manufacturer, service agent
or similarly qualified persons in order to avoid hazard.
Accessing the installer wiring
1.
Isolate the mains supply from the boiler.
2.
Remove the front panel. Refer to section 3.2.
3.
Swing down the control box into the service position,
unclip and swing back the installer wiring cover and latch
into the retaining clips. Refer to Section 3.9.
All of the connections can now be readily accessed, the plugs
can be removed to aid wiring.
Note the cable strain relief system and grommets. Once any
wiring is completed, to secure the boiler, reverse the order
above.
Note 1
The link wire on the 230V installer room stat/timer
connection gives a demand in conjunction with the OpenTherm
link wire (located on the right hand side of the control box).
INSTALLER CONNECTIONS (LHS)
INSTALLER CONNECTIONS (RHS)
Содержание LOGIC+ COMBI C35
Страница 2: ...2 Installation and Servicing ...
Страница 66: ...66 Installation and Servicing INTENTIONALLY LEFT BLANK ...