8
Installation and Servicing
Section 5 - Package Installation
IMPORTANT POINTS
Before commencing installation:
For Frame mounting:
• The frame must stand on a flat and level floor of suitable load
bearing capacity.
• The frame must be bolted / secured to the floor after the
connections are made to the boiler or system pipework from the
package to allow for minor adjustments of the position of the
package.
MOUNTING FRAME MUST BE SECURED TO THE FLOOR
These Installations refer to perpendicular walls and floors.
Allowances must be made for installation where skirting boards or
other features are in place that may affect the nominal installation
conditions.
Содержание EVOMAX 2 30
Страница 13: ...Notes 13 Plate Heat Exchanger Package...
Страница 14: ...Notes 14 Plate Heat Exchanger Package...
Страница 15: ...Notes 15 Plate Heat Exchanger Package...