13
Response 80 / 100 / 120
- Installation
8
UNPACKING
9
PACKAGING AND FRONT PANEL REMOVAL
Pack B Contents
!
Terminal grille assembly
!
No.8 x 8mm self tapping screw - 3 off
!
No.10 x 2" slotted Rd. Hd. screw - 4 off
!
Flue support cutting aid - 1 off
!
Wall plugs - 4 off
!
Terminal wall plate - 1 off
1. Remove the lid.
2. The top tray contains:
!
Flue turret
!"
Mounting frame
!"
Hardware pack
!"
Stand-off channels
!"
Wall mounting template
!"
Installation instructions
These contents can be removed, leaving the boiler in its protective package.
INSTALLATION
INST
ALLA
TION
The boiler is supplied fully assembled in one Pack A, together with a standard
flue assembly for lengths up to 600mm, rear or side flue outlet, in Pack B.
Unpack and check the contents.
Pack A Contents
!
The boiler.
!
These Installation & Servicing Instructions.
!
The User's Instructions.
!
Wall mounting template.
!
Wall mounting frame.
!
1 pair stand-off channels (optional use).
!
Flue turret.
!
Clamping and sealing ring.
!
Mains connector assy.
!
Hardware Pack.
!
Coupling Hardware Pack.
Hardware Pack
!
M6 x 16 Pp. Hd. screw - 4 off.
!
1/2" x 15mm copper connector - 1 off.
!
No.14 x 2" slotted Rd. Hd. screw - 6 off.
!
Wall plug (brown) - 6 off.
!
1/2" Nut - 2 off.
!
M28 Nut - 2 off.
!
22mm pipe connector - 2 off.
!
15mm pipe connector - 2 off.
!
22mm x 15mm reducing coupling - 1 off.
!
Pressure relief valve drain pipe - 1 off.
!
Pressure relief valve nut - 1off.
!
Gas pipe assy. - 1 off.
!
22mm olive - 2 off.
!
15mm olive - 3 off.
!
26mm Sealing washer - 3 off.
!
12mm Sealing washer - 3 off.
Coupling Hardware Pack.
!
28 x 22 mm straight coupling
.
Filter Hardware Pack.
!
DHW inlet filter
Содержание responce 80
Страница 1: ......
Страница 61: ...61 Response 80 100 120 Installation 89 SHORT PARTS LIST 90 BOILER CASING ASSEMBLY SHORT LIST OF PARTS Res 5972...
Страница 62: ...62 Response 80 100 120 Installation NOTES...
Страница 63: ...63 Response 80 100 120 Installation NOTES...