16
INSTALLATION
Procombi Exclusive
-
Installation and Servicing
3G9988
“A” - See Diagram in
Frame 1
Extended centre line
155
(200)
3G9495
X
Section
through wall
Note.
Check all of the hole
positions before drilling.
Side flue only
5" diameter hole
Rear flue only
5" diameter hole
The wall mounting template is located on the internal protective
packaging. The template shows the position of the fixing and rear
flue centre holes for a standard installation
Care MUST be taken to ensure the correct holes are drilled.
1.
Tape template into the required position, ensuring its squareness
by hanging a plumbline as shown.
2.
If fitting a side flue, extend the flue centreline onto the side by
155mm
on a standard wall fix or
200mm
if using a stand-off
bracket.
3.
Mark the following on to the wall:
a
The selected group of wall mounting screw holes.
b.
The centre position of the flue duct. Marking both the centre
and the circumference of the flue duct.
4.
Remove the template plate from the wall.
8 WaLL MOUNTINg TEMpLaTE
9 pREpaRINg ThE WaLL
IMpORTaNT.
Ensure that, during the cutting operation, masonry falling
outside of the building does not cause damage or personal
injury.
1.
Cut the flue hole (preferably with a 5” core boring tool),
ensuring that the hole is square to the wall.
Both wall faces immediately around the cut hole should be
flat.
2.
Drill 2 mounting holes (marked from template) with a 7.5mm
/ 8mm masonry drill and insert the plastic plugs, provided,
for the wall mounting plate.
3.
Locate 2 No.14 x 50mm screws in the wall mounting plate
(one at each side, in any of the 3 holes provided at each
side) and screw home. Ensure mounting bracket is level.
11 MOUNTINg ThE bOILER
10 FITTINg ThE WaLL MOUNTINg pLaTE
Screw the wall mounting plate to the wall using 2 wall plugs
(previously fitted) with the 2 screws provided.
Choose one of the 2 sets of slots in left and right bank.
Ensuring that at least one of the screws is fitted into a top slot
and the mounting bracket is level.
IN
s
T
a
LL
a
TION
nOTE
. ENSURE BOTTOM END SUPPORT IS LEFT IN PLACE
1.
Lift the boiler onto
the wall mounting
plate (refer to the
Introduction section
for safe handling
advice), locating it
over the two tabs.
2.
Remove the
bottom end support
packaging.
3.
Ensure the plastic
plugs are removed
from both the CH and
DHW connections.
9982b
3G9948
Example of fixing