Classic FF -
Propane Installation & Servicing
13
INSTALLATION
9
PACKAGING AND CASING REMOVAL
SIDE FLUE
INSTALLATION
REAR FLUE
INSTALLATION
Flue length
for rear
Flue length for side
Jacking screw for
boiler alignment
It is MOST important that the boiler is installed in a
vertical position.
FLUE KITS
Pack B: supplied as standard.
Pack D: optional extension kit for side flue or rear flue
outlet. Refer to 'Flue Extension Ducts'
1. A maximum of 3 extension ducts (plus the
standard flue duct) may be used together.
2. Flue extensions of greater than 1m (39") should
be supported with the bracket provided. If the
stand off brackets have been used, it is necessary,
in order to keep the flue aligned, to use the spacer
bracket with the support bracket.
(a) Casing retaining
screws, 2 off
Packing base
Controls pod casing
1. Unpack the boiler
2. Remove the casing as follows and place to one
side to avoid damage.
a. Undo the 2 casing retaining screws (a)
retaining the casing to the back panel.
b. Swing the bottom of the boiler casing up until
the controls pod casing has cleared the
controls then unhook the top from the back
panel.
3. Remove the boiler from its packaging base. The
boiler may now be stood upright on its controls
support protection frame to ease handling and
installation.
4. Unpack the boiler terminal box and, if applicable,
the extension flue box(es)
10 DETERMINING THE FLUE LENGTH
Flue length mm
Accessories
Product No.
Up to 600
B Pack 1 off
150308
600 to 1550
B Pack 1 off + D Pack, 1 off
153883
1550 to 2500
B Pack 1 off + D Pack, 2 off
153883, 2 off
2500 to 3000
B Pack 1 off + D Pack, 3 off
153883, 3 off
Note.
Vertex and roof flue kits are available as optional
extras for vertical flue installation, supplied with
separate fitting instructions.
INST
ALLA
TION
Содержание FF 350
Страница 1: ......
Страница 39: ...Classic FF Propane Installation Servicing 39 NOTES...