GENERAL

This appliance in NOT suitable for use in a direct
hot water system or for gravity circulation.

FF 370, FF 380 & FF3 100 ONLY

must be fitted with the 22mm x 28mm copper sockets,
provided in the Hardware Pack, (or equivalent 22mm x
28mm compression fittings ) and the pumped flow and
return pipes run in 28mm pipe.

1

BOILER WATER CONNECTIONS

The following minimum clearances
must be maintained for operation and
servicing.

Additional space will be required for
installation, depending upon site
conditions.

Side and Rear Flue

a. Provided that the flue hole is cut

accurately, e.g.  with a core drill, the
flue can be installed from inside the
building.

Installation from inside ONLY

b. If a core boring tool is to be used

inside the building; the space in
which the boiler is to be installed
must be at least wide enough to
accommodate the tool.

c. If using the Complete Sealed

System Unit then refer to the
instructions packed with the unit for
the necessary clearances.

Pelmet restrictions.

If the ability to fit or remove the
casing during installation and
subsequent servicing is impaired
by pelmets etc. this operation can
be made easier by first removing
the controls pod casing in line
with the following instructions:

a. Release the controls pod

casing fixing screws (a) 3 full
turns only. Remove the pod by
pulling it forward to disengage
from the keyhole slots.

b. Undo the 2 screws (b)

retaining casing to the back
panel.

c. The casing can now be

removed in the direction of the
arrow, first lifting the casing
slightly to disengage the
casing top return from the
back panel. (For this purpose
a minimum clearance of
12mm is required between
the top of the boiler and
pelmet or other similar
obstruction.

Front clearance: 533mm (21")
from the front of the boiler
casing.

Minimum front clearance when
built in to cupboard is 75 mm
(3").

380
(15")

300
(12")

Pumped
return
pipe

Pumped
flow pipe

12 (1/2")

100

(4")

44

(1 3/4")

Flue
terminal

300 (12")

Jacking 
screw

Gas
connection

700
(27 1/2")

141
(5 9/16")

Clas 1783

Front View

Side View

133 (5 1/4")

44 (1 3/4")

20 (3/4")

Gas
connection

2 BOILER CLEARANCES

Содержание FF 330

Страница 1: ...EERED FOR PEACE OF MIND When replacing any part on this appliance use only spare parts that you can be assured conform to the safety and performance specification that we require Do not use reconditio...

Страница 2: ...m 28mm copper copper FEMALE Maximum static water head m ft 30 5 100 Minimum static water head m ft 0 45 1 5 Electrical supply 230 V 50 Hz Boiler power consumption 100W Fuse rating External 3A Internal...

Страница 3: ...07 Destination Countries GB IE Models G C Appliance No Classic FF 330 41 391 54 Classic FF 340 41 391 95 Classic FF 350 41 391 96 Classic FF 360 41 391 97 Classic FF 370 41 391 98 Classic FF 380 41 39...

Страница 4: ...eal Limited could invalidate the BSI Certification and the normal appliance warranty It could also infringe the Gas Safety Regulations and the above regulations SAFE HANDLING OF SUBSTANCES Care should...

Страница 5: ...ns packed with the unit for the necessary clearances Pelmet restrictions If the ability to fit or remove the casing during installation and subsequent servicing is impaired by pelmets etc this operati...

Страница 6: ...ngs are specified in Table 3 4 Where the lowest part of the terminal is fitted less than 2m 6 6 above a balcony above ground or above a flat roof to which people have access then the terminal MUST be...

Страница 7: ...al Limited INVALID Caradon Ideal Limited recommend Water Treatment in accordance with the Benchmark Guidance Notes on Water Treatment in Central Heating Systems Caradon Ideal Limited recommend the use...

Страница 8: ...Limited Note A cold water feed must be available back to the boiler when all automatic valves are in the closed position refer to BS 6798 and when close coupled the feed must not be in a vertical leg...

Страница 9: ...overing at least the range 0 4 bar 0 60 lb in2 must be fitted to the system The gauge should be easily seen from the filling point and should preferably be connected at the same point as the expansion...

Страница 10: ...n automatic air vent connected between them the stop valve being located between the system and the automatic air vent The stop valve may remain open during normal operation of the system if automatic...

Страница 11: ...shown LEGEND 1A Heat exchanger 2 Flue baffles 3 Tie rods 4A Pumped flow pipe 5A Pumped return pipe 6 Collector hood assembly 7 Combustion chamber 12 Main burner 19 Control box 24 Pressure switch 30 F...

Страница 12: ...1 off No 8 x 8 lg Pozi pan hd screws 3 off 8 UNPACKING Pack A Contents The complete boiler Installation Servicing Instructions User s Instructions Hardware Pack listed below Wall mounting template Wal...

Страница 13: ...d Pack D optional extension kit for side flue or rear flue outlet Refer to Frame 33 1 A maximum of 2 extension ducts plus the standard flue duct may be used together 2 Flue extensions of greater than...

Страница 14: ...n 3 Ensure squareness by hanging a plumb line as shown 4 Mark onto the wall if required the following a The wall mounting plate screw positions choose one from each group Note Mark the centre of the f...

Страница 15: ...uct Ensure the boiler sealing ring is fully engaged Ensure the notch aligns with the groove on the outer flue duct This ensures correct alignment of the flue terminal 4 Stick the self adhesive foam st...

Страница 16: ...boiler 1 Lift the boiler onto the wall mounting plate hooks as shown Do not use the burner controls for lifting 2 Fit the M8 screw washer and rectangular plate to retain the boiler Note Before fully t...

Страница 17: ...hole has been accurately cut with a drill then making good the wall faces is not essential as seals are provided at both ends of the flue However both wall faces immediately around the cut hole should...

Страница 18: ...s cut square mark the flue all the way round 4 Insert the cardboard duct ring for support and cut to length 5 Remove cardboard duct ring and remove any burrs 26 FITTING BOILER SEALING RING TO THE FLUE...

Страница 19: ...s is required then the downward routing pipe brackets and M8 spacer supplied in the Downward Piping Kit should be fitted to the wall mounting plate now 3 Fit the bottom 2 screws to secure the bracket...

Страница 20: ...to the fan 5 Pull the flue extension tube and engage onto the fan elbow and secure with the screw attached to the elbow Note The sealing ring studs will locate in the back panel one way only This will...

Страница 21: ...for FF 3 100 model 35 FITTING THE KIT 1 Remove the cardboard support aid from the flue and place safely to one side 2 Fit the inner flue extension duct onto the inner flue duct 3 Fit the outer flue ex...

Страница 22: ...to Frame 43 3 If a proprietary system is used follow the instructions supplied by the manufacturer 4 System designs featuring controls or wiring arrangements which allow the boiler to fire when there...

Страница 23: ...led system set the boiler thermostat to maximum 4 Switchmaster Midi is similar in operation but the wiring differs slightly see the manufacturer s literature 40 PICTORIAL WIRING 41 MID POSITION VALVE...

Страница 24: ...e left off for more than a day or so then a frost thermostat should be wired into the system This is usually done at the programmer in which case the programme selector switches are set to OFF and all...

Страница 25: ...servicing position See diagram B 4 Slacken the screw in the burner pressure test point F and connect a gas pressure gauge via a flexible tube 5 Swing the control box back into its working position 6 P...

Страница 26: ...002 10 Stress the importance of regular servicing by a CORGI registered installer and that a comprehensive service should be carried out AT LEAST ONCE A YEAR In IE servicing work must be carried out b...

Страница 27: ...e LH bottom rear of the burner and pull the burner downwards to disengage the retention tab Remove the burner to a safe place for inspection and cleaning 2 Remove the control box fixing screw Pull the...

Страница 28: ...o the fan Disconnect the connector from the fan and slide into the flue 3b Side or top flue Slacken off two M4 screws securing the flue elbow and flue connector Disconnect the flue connector from the...

Страница 29: ...hermostat and reassemble in reverse order 6 Check the operation of the boiler 55 GAS PRESSURE ADJUSTMENT PILOT The pilot is factory set to maximum and no further adjustment is possible If after removi...

Страница 30: ...sensor lead connector off the printed circuit board and cut the cable strap securing the thermistor harness to the bottom panel of the control box if fitted and remove the strap 6 Remove the sensor f...

Страница 31: ...her is replaced when refitting the pilot injector 6 Replace the electrode and pilot shield retaining both with the electrode nut Check the spark gap 7 Reassemble in reverse order 8 Check the operation...

Страница 32: ...f the procedure detailed below 1 Refer to Frame 56 2 Remove the burner and air box assembly Refer to Frame 51 3 Remove the electrode retaining nut 4 Remove the pilot shield 5 Remove the ignition elect...

Страница 33: ...ts and withdraw from the control box 6 Fit the new PCB and reassemble in reverse order 7 Check the operation of the boiler Fuse To change the fuse prise it out of the holder and disengage the fuse Ref...

Страница 34: ...with water pipes and hang it on the key hole slots and screws Retighten the screws 12 Replace the 2 rubber sealing grommets 13 Reassemble in reverse order 14 Remake all water connections ensuring that...

Страница 35: ...ked YES Replace gas valve NO Is there a supply on terminals of main gas valve YES NO YES NO NO Is there a supply on the fan connector at PCB Molex marked FAN YES YES NO NO Check the polarity of the ma...

Страница 36: ...929 30 Fan assembly E83 665 FF 330 380 1 171 461 E87 032 FF 3100 1 171 462 35 Boiler casing assembly complete with sightglass assy insulation and M5 x 16 dogpoint pozi pan hd FF 330 380 1 171 471 FF...

Страница 37: ...Classic FF Installation Servicing 37 LIST OF PARTS cla 6113 45 59 23 12 18 19 30 24 39 9 17 26 15 14 13 13 A 72 SHORT PARTS LIST 73 BOILER CASING ASSEMBLY...

Страница 38: ...pilot assembly 12 Main burner 13 Main burner injector 16 Pilot shield 17 Gas control valve 42 Gas service cock 75 BURNER ASSEMBLY Exploded View LEGEND 19 Control box 21 Thermostat potentiometer 23 Pr...

Страница 39: ...Classic FF Installation Servicing 39 NOTES...

Страница 40: ...cation without notice The Ideal Boilers Technical Training Centre offers a series of first class training courses for domestic commercial and industrial heating installers engineers and system specifi...

Отзывы: