Installation

MAIN BURNER

After any servicing, reference should be made to Table 2
which quotes details of the rated output with the related
burner setting pressure and the heat input. Any required
adjustments should be made by using the pressure
adjustment screw.

Refer to 'initial Lighting', Frame 43.

REPLACEMENT OF PARTS

Refer to Frames 37, 54 & 70.

1.

Remove the control box fixing screw.

56 OVERHEAT THERMOSTAT REPLACEMENT

SER

VICING

54 GENERAL

When replacing any component:

1.

Isolate the electricity supply.

2.

Turn OFF the gas supply.

3.

Remove the boiler casing.  Refer to Frame 48.

IMPORTANT.

 When work is complete the casing must

be correctly refitted, ensuring that a good seal is made.

2.

Pull the box forward and
downward to disengage.

3.

To remove the overheat
thermostat pull off the
electrical connections at
the thermostat. Remove
the backnut retaining the
thermostat to the bracket.
Remove the thermostat
from the heat exchanger
pocket.

4.

Re-assemble in reverse
order.

53 GAS PRESSURE ADJUSTMENT

Note. 

Standard model illustrated.  For the deluxe model (LX) slide

the glass fascia out before removing the sightglass assembly.
Refit the glass fascia after refitting the new sightglass assembly.

PILOT

The pilot is factory set to maximum and no further
adjustment is possible. If, after removing and checking the
injector (as detailed in Frame 58) and ensuring that there is
an inlet pressure of 20 mbar available, the pilot does not
light then contact 

Caradon Plumbing Limited.

Relight in accordance with 'Initial Lighting', Frame 43.

SERVICING

Note.

 In order to assist fault finding, the control box printed

circuit board is fitted with 2 indicator lights which represent the
following boiler conditions:

Neon 

I

3.

Mains electricity ON.

Neon SG1.

Flashes to indicate ignition operation (stops after
detection).

The boiler MUST NOT be operated if the casing is not fitted.

55 SIGHTGLASS REPLACEMENT

1.

Refer to Frame 54.

2.

Unfasten the 2 nuts and washers holding the sightglass
assembly to the casing front panel.

3.

When fixing the new assembly ensure that the parts are in
the correct order. The frame must have the return edge at
the bottom.

4.

Retighten the 2 nuts to ensure an airtight seal. Do NOT
overtighten.

6.

Replace the boiler casing. Refer to Frame 52.

Содержание Classic FF230

Страница 1: ......

Страница 2: ...Classic LXFF FF Installation CAUTION To avoid the possibility of injury during the installation servicing or cleaning of this appliance care should be taken when handling edges of sheet steel componen...

Страница 3: ...1 76 0 76 4 Boiler Size FF 230 FF 240 FF 250 FF 260 FF 270 FF 280 FF 2 100 Gas supply connection in BSP Rc 1 2 1 2 1 2 BSP Female Flow connection 22mm 28mm copper copper FEMALE Return connection 22mm...

Страница 4: ...d appliance designed for connection via ducts to a horizontal or vertical terminal which admits fresh air to the burner and discharges the products of combustion to the outside through orifices which...

Страница 5: ...ater central heating systems BS 5440 1 Flues for gas appliances of rated input not exceeding 60 kW BS 5440 2 Ventilation for gas appliances of rated input not exceeding 60 kW Health Safety Document No...

Страница 6: ...e enough to accommodate the tool c If using the Complete Sealed System Unit then refer to the instructions packed with the unit for the necessary clearances Pelmet restrictions If the ability to fit o...

Страница 7: ...l to obstructions and ventilation openings are specified in Table 3 4 Where the lowest part of the terminal is fitted less than 2m 6 6 above a balcony above ground or above a flat roof to which people...

Страница 8: ...used for direct hot water supply For the types of system and correct piping procedure refer to Introduction and Frame 1 The central heating system should be in accordance with BS 6798 and in addition...

Страница 9: ...circulator capable of providing an 11 C 20 F temperature differential e g Grunfos UPS 15 50 or equivalent The vertical distance between the pump and feed expansion cistern MUST comply with the pump m...

Страница 10: ...ector hood assembly 2 Inter panel 3 Pumped return pipe 4 Rubber sealing grommets 5 Pumped flow pipe 6 Wall mounting plate 7 Sealing plates 3 off 9 Back panel 10 Controls support 11 Control box 12 Prog...

Страница 11: ...wall plate 1 off z Terminal grille assy 1 off z Polyurethane foam seal 400 lg 1 off z No 8 x 8 lg Pozi pan hd screws 3 off 6 UNPACKING Pack A Contents z The complete boiler z Installation Servicing I...

Страница 12: ...39 should be supported with the bracket provided If the stand off brackets have been used it is necessary in order to keep the flue aligned to use the spacer bracket with the support bracket It is MOS...

Страница 13: ...shown 4 Mark onto the wall if required the following a The wall mounting plate screw positions choose one from each group Note Mark the centre of the flue hole as well as the circumference b The posi...

Страница 14: ...t Ensure the boiler sealing ring is fully engaged Ensure the notch aligns with the groove on the outer flue duct This ensures correct alignment of the flue terminal 4 Stick the self adhesive foam stri...

Страница 15: ...plate hooks as shown Do not use the burner controls for lifting 2 Fit the M8 screw washer and rectangular plate to retain the boiler Note Before fully tightening the M8 screw check the boiler alignme...

Страница 16: ...making good the wall faces is not essential as seals are provided at both ends of the flue However both wall faces immediately around the cut hole should be flat make good if necessary For less accura...

Страница 17: ...be is cut square mark the flue all the way round 4 Insert the cardboard duct ring for support and cut to length 5 Remove cardboard duct ring and remove any burrs 24 FITTING BOILER SEALING RING TO THE...

Страница 18: ...s required then the downward routing pipe brackets and M8 spacer supplied in the Downward Piping Kit should be fitted to the wall mounting plate now 3 Fit the bottom 2 screws to secure the bracket s t...

Страница 19: ...e fan 5 Pull the flue extension tube and engage onto the fan elbow and secure with the screw attached to the elbow Note The sealing ring studs will locate in the back panel one way only This will ensu...

Страница 20: ...inal grille Boiler Extension tube Not for FF 2 100 model 33 FITTING THE KIT 1 Remove the cardboard support aid from the flue and place safely to one side 2 Fit the inner flue extension duct onto the i...

Страница 21: ...wired into the mains lead in parallel with the control s to be overridden Refer to Frame 41 3 If a proprietary system is used follow the instructions supplied by the manufacturer 4 System designs fea...

Страница 22: ...This is a fully controlled system set the boiler thermostat to maximum 4 Switchmaster Midi is similar in operation but the wiring differs slightly see the manufacturer s literature LEGEND b blue bk b...

Страница 23: ...iler will be left off for more than a day or so then a frost thermostat should be wired into the system This is usually done at the programmer in which case the programme selector switches are set to...

Страница 24: ...asing down and secure with the 2 captive screws To improve access to the gas valve remove the controls pod casing Release the controls pod front fixing screws 3 turns only Remove the pod by pulling it...

Страница 25: ...them to the Householder 9 After installation commissioning and customer hand over instructionspleasecompletethe appliancelog book and leave this with the customer 10 Stress the importance of regular...

Страница 26: ...iler casing must be removed Refer to Frame 48 3 Pull the HT lead connection off the printed circuit board and pull the lead upwards through the bottom panel grommet 4 Remove the 4 screws retaining the...

Страница 27: ...nnect the fan leads 3a Rear flue Slacken the M4 screw securing the flue connector to the fan Disconnect the connector from the fan and slide into the flue 3b Side or top flue Slacken off two M4 screws...

Страница 28: ...model illustrated For the deluxe model LX slide the glass fascia out before removing the sightglass assembly Refit the glass fascia after refitting the new sightglass assembly PILOT The pilot is fact...

Страница 29: ...2 side retaining clips and remove the switch 12 Re assemble in reverse order 57 THERMOSTAT CONTROL THERMISTOR SENSOR LEAD and ON OFF SWITCH REPLACEMENT 58 PILOT BURNER REPLACEMENT 1 Refer to Frame 54...

Страница 30: ...order 10 Replace the boiler casing 11 Check the gas valve operation 1 Refer to Frame 54 2 Remove the burner and air box assembly Refer to Frame 49 3 Remove the electrode retaining nut 4 Remove the pi...

Страница 31: ...barbs on the PCB stand offs to release the PCB from the box 9 Fit the new PCB and re assemble in reverse order ensuring the correct orientation of the switch 10 Refit the boiler casing 11 Check the o...

Страница 32: ...rews Retighten the screws 12 Replace the 2 rubber sealing grommets 13 Re assemble in reverse order 14 Remake all water connections ensuring that the compression fittings if used are correctly refitted...

Страница 33: ...ssure switch Is the boiler casing correctly fitted Does the pilot light NO YES NO YES Does the spark stop after pilot is lit NO Is there a gas supply to the boiler Is the pilot injector blocked YES Re...

Страница 34: ...at knob 1 079601 25 386 149 Automatic ignition printed circuit board PACTROL PCB 25 B 1 079716 27 385 861 Pressure switch HONEYWELL YAMATAKE C6065 A 1010 1 111379 28 E02 661 Fan assembly SIFAN No WFFB...

Страница 35: ...d pilot assembly 13 Main burner 14 Main burner injector 69 BURNER ASSEMBLY Exploded View LEGEND Numbers up to 51 relate to the B G spares list 20 Control box 21 Thermostat potentiometer 24 Thermostat...

Страница 36: ...36 Classic LXFF FF Installation 71 BOILER CASING ASSEMBLY SHORT LIST OF PARTS Deluxe model LX Standard model 72 SHORT PARTS LIST...

Страница 37: ...Classic LXFF FF Installation 37...

Страница 38: ...01482 492 251 Fax 01482 448 858 Registration No London 322 137 Registered Office National Avenue Kingston upon Hull HU5 4JN A subsidiary of Caradon p l c THIS SYMBOL IS YOUR ASSURANCE OF QUALITY These...

Страница 39: ...l be giving away a free boiler for the five best ideas every year to be selected by our Technical Director Please complete this form using extra sheets if required and post it or fax it to us on 01482...

Страница 40: ...to contact me Please arrange for me to join an Ideal factory tour Range guides required The Ideal Guide a specifier s and installer s introduction to the Ideal domestic boiler range The Ideal Househo...

Отзывы: