background image

Classic 

LXFF, FF

 - 

Installation

5

INTRODUCTION

The Classic FF230-2 100 

(standard) and the 

Classic LX FF 230-

280

 (deluxe casing) is a range of automatically fully controlled,

wall mounted, balanced flue, fanned gas boilers.

The heat exchanger is cast iron.  The boiler casing is of white
enamelled mild steel.

FF 230-2 100 (Standard Model)

The boiler casing has a removable controls pod containing a drop-
down door. The boiler thermostat is located behind the drop- down
door.

FF LX 230-280 (Deluxe Model LX)

The boiler casing is fitted with a glass fascia.  The glass fascia can
be lifted up to gain access to the boiler thermostat.

All details for the deluxe casing model are the same as the
standard model unless otherwise stated.

Note. 

These boilers cannot be used on systems which include

gravity circulation.

 If gravity circulation is required the 

Classic RS

range of boilers is suitable.

See Frame 1 for details of the correct boiler tappings to use.

The boilers are supplied with a standard flue kit suitable for rear or
side outlet applications from 114 mm (4 

1/2

") to 600 mm

(23 

1/2

").

The boilers are suitable for connection to the following open
vented or sealed systems:

z

Fully pumped CH and indirect DHW

z

Pumped heating only.

z

Pumped indirect DHW only.

OPTIONAL EXTRA KITS

Downward Piping Kit.
Programmer Kit.
Vertex Flue Kit*

 - for vertical flue connection

Roof Flue Kit*
90°

 

Flue Elbow Kit

*

Sealed System Unit - 

this fits on top of the appliance.

Suitable for standard boiler only.

Extension ducts

*

 -

 up to 3m (118").

Turret Outlet Kit.

*

*

not available for FF2 100

The installation of the boiler MUST also be in accordance with the
latest I.E.E (BS.7671) Wiring Regulations, local building
regulations, bylaws of the local water authority, the Building
Regulations and Building Standards (Scotland) and any relevant
requirements of the local authority.  Detailed recommendations
are contained in the following British Standard Codes of Practice:

BS.6891

Low pressure installation pipes.

BS.6798

Installation of gas fired hot water boilers of rated input
not exceeding 60 kW.

BS.5449

Forced circulation hot water systems.

BS.5546

Installation of gas hot water supplies for domestic
purposes (2nd Family Gases).

BS.7593

Treatment of water in domestic hot water central
heating systems.

BS.5440.1

Flues for gas appliances of rated input not exceeding
60 kW.

BS.5440.2

Ventilation for gas appliances of rated input not
exceeding 60 kW.

Health & Safety Document No. 635

The Electricity at Work Regulations, 1989.

Manufacturer’s notes must NOT be taken in any way as overriding
statutory obligations.

IMPORTANT.

 These appliances are certificated by the British

Standards Institution for safety and performance. It is, therefore,
important that no external control devices, e.g. flue dampers,
economisers etc., are directly connected to these appliances -
unless covered by these Installation and Servicing instructions or
otherwise recommended by 

Caradon Plumbing Limited

 in writing.

If in doubt please enquire.

Any direct reconnection of a control device not approved by

Caradon Plumbing Limited

 could invalidate the BSI Certification

and the normal appliance warranty. It could also infringe the Gas
Safety Regulations and the above regulations.

LOCATION OF BOILER

The boiler must be installed on a flat and vertical  wall, capable of
adequately supporting the weight of the boiler and any ancillary
equipment.

The boiler may be fitted on a combustible wall and insulation
between the wall and the boiler is not necessary - unless required
by the local authority. 

The boiler must not be fitted outside.

Timber Framed Buildings

If the boiler is to be fitted in a timber framed building it should be
fitted in accordance with the  Institute of Gas Engineering document
IGE/UP/7:1998.

Bathrooms

The boiler may be installed in any room or internal space, although
particular attention is drawn to the requirements of the current I.E.E.
(BS.7671) Wiring Regulations and, in Scotland, the electrical
provisions of the building regulations applicable in Scotland with
respect to the installation of the boiler in a room or internal space
containing a bath or shower.   

continued on page 7

GENERAL

NOTE TO THE INSTALLER: LEAVE THESE

INSTRUCTIONS ADJACENT TO THE GAS METER.

ALSO COMPLETE THE BENCHMARK LOG BOOK

AND GIVE THIS TO THE CUSTOMER.

GAS SAFETY (INSTALLATION AND USE) Regulations
1994, amendments 1996 or rules in force.

It is law that 

all

 gas appliances are installed by a CORGI registered

installer (identified by 

) in accordance with the above regulations.

Failure to install appliances correctly could lead to prosecution. It
is in your own interest, and that of safety, to ensure the law is
complied with.

Содержание Classic FF230

Страница 1: ......

Страница 2: ...Classic LXFF FF Installation CAUTION To avoid the possibility of injury during the installation servicing or cleaning of this appliance care should be taken when handling edges of sheet steel componen...

Страница 3: ...1 76 0 76 4 Boiler Size FF 230 FF 240 FF 250 FF 260 FF 270 FF 280 FF 2 100 Gas supply connection in BSP Rc 1 2 1 2 1 2 BSP Female Flow connection 22mm 28mm copper copper FEMALE Return connection 22mm...

Страница 4: ...d appliance designed for connection via ducts to a horizontal or vertical terminal which admits fresh air to the burner and discharges the products of combustion to the outside through orifices which...

Страница 5: ...ater central heating systems BS 5440 1 Flues for gas appliances of rated input not exceeding 60 kW BS 5440 2 Ventilation for gas appliances of rated input not exceeding 60 kW Health Safety Document No...

Страница 6: ...e enough to accommodate the tool c If using the Complete Sealed System Unit then refer to the instructions packed with the unit for the necessary clearances Pelmet restrictions If the ability to fit o...

Страница 7: ...l to obstructions and ventilation openings are specified in Table 3 4 Where the lowest part of the terminal is fitted less than 2m 6 6 above a balcony above ground or above a flat roof to which people...

Страница 8: ...used for direct hot water supply For the types of system and correct piping procedure refer to Introduction and Frame 1 The central heating system should be in accordance with BS 6798 and in addition...

Страница 9: ...circulator capable of providing an 11 C 20 F temperature differential e g Grunfos UPS 15 50 or equivalent The vertical distance between the pump and feed expansion cistern MUST comply with the pump m...

Страница 10: ...ector hood assembly 2 Inter panel 3 Pumped return pipe 4 Rubber sealing grommets 5 Pumped flow pipe 6 Wall mounting plate 7 Sealing plates 3 off 9 Back panel 10 Controls support 11 Control box 12 Prog...

Страница 11: ...wall plate 1 off z Terminal grille assy 1 off z Polyurethane foam seal 400 lg 1 off z No 8 x 8 lg Pozi pan hd screws 3 off 6 UNPACKING Pack A Contents z The complete boiler z Installation Servicing I...

Страница 12: ...39 should be supported with the bracket provided If the stand off brackets have been used it is necessary in order to keep the flue aligned to use the spacer bracket with the support bracket It is MOS...

Страница 13: ...shown 4 Mark onto the wall if required the following a The wall mounting plate screw positions choose one from each group Note Mark the centre of the flue hole as well as the circumference b The posi...

Страница 14: ...t Ensure the boiler sealing ring is fully engaged Ensure the notch aligns with the groove on the outer flue duct This ensures correct alignment of the flue terminal 4 Stick the self adhesive foam stri...

Страница 15: ...plate hooks as shown Do not use the burner controls for lifting 2 Fit the M8 screw washer and rectangular plate to retain the boiler Note Before fully tightening the M8 screw check the boiler alignme...

Страница 16: ...making good the wall faces is not essential as seals are provided at both ends of the flue However both wall faces immediately around the cut hole should be flat make good if necessary For less accura...

Страница 17: ...be is cut square mark the flue all the way round 4 Insert the cardboard duct ring for support and cut to length 5 Remove cardboard duct ring and remove any burrs 24 FITTING BOILER SEALING RING TO THE...

Страница 18: ...s required then the downward routing pipe brackets and M8 spacer supplied in the Downward Piping Kit should be fitted to the wall mounting plate now 3 Fit the bottom 2 screws to secure the bracket s t...

Страница 19: ...e fan 5 Pull the flue extension tube and engage onto the fan elbow and secure with the screw attached to the elbow Note The sealing ring studs will locate in the back panel one way only This will ensu...

Страница 20: ...inal grille Boiler Extension tube Not for FF 2 100 model 33 FITTING THE KIT 1 Remove the cardboard support aid from the flue and place safely to one side 2 Fit the inner flue extension duct onto the i...

Страница 21: ...wired into the mains lead in parallel with the control s to be overridden Refer to Frame 41 3 If a proprietary system is used follow the instructions supplied by the manufacturer 4 System designs fea...

Страница 22: ...This is a fully controlled system set the boiler thermostat to maximum 4 Switchmaster Midi is similar in operation but the wiring differs slightly see the manufacturer s literature LEGEND b blue bk b...

Страница 23: ...iler will be left off for more than a day or so then a frost thermostat should be wired into the system This is usually done at the programmer in which case the programme selector switches are set to...

Страница 24: ...asing down and secure with the 2 captive screws To improve access to the gas valve remove the controls pod casing Release the controls pod front fixing screws 3 turns only Remove the pod by pulling it...

Страница 25: ...them to the Householder 9 After installation commissioning and customer hand over instructionspleasecompletethe appliancelog book and leave this with the customer 10 Stress the importance of regular...

Страница 26: ...iler casing must be removed Refer to Frame 48 3 Pull the HT lead connection off the printed circuit board and pull the lead upwards through the bottom panel grommet 4 Remove the 4 screws retaining the...

Страница 27: ...nnect the fan leads 3a Rear flue Slacken the M4 screw securing the flue connector to the fan Disconnect the connector from the fan and slide into the flue 3b Side or top flue Slacken off two M4 screws...

Страница 28: ...model illustrated For the deluxe model LX slide the glass fascia out before removing the sightglass assembly Refit the glass fascia after refitting the new sightglass assembly PILOT The pilot is fact...

Страница 29: ...2 side retaining clips and remove the switch 12 Re assemble in reverse order 57 THERMOSTAT CONTROL THERMISTOR SENSOR LEAD and ON OFF SWITCH REPLACEMENT 58 PILOT BURNER REPLACEMENT 1 Refer to Frame 54...

Страница 30: ...order 10 Replace the boiler casing 11 Check the gas valve operation 1 Refer to Frame 54 2 Remove the burner and air box assembly Refer to Frame 49 3 Remove the electrode retaining nut 4 Remove the pi...

Страница 31: ...barbs on the PCB stand offs to release the PCB from the box 9 Fit the new PCB and re assemble in reverse order ensuring the correct orientation of the switch 10 Refit the boiler casing 11 Check the o...

Страница 32: ...rews Retighten the screws 12 Replace the 2 rubber sealing grommets 13 Re assemble in reverse order 14 Remake all water connections ensuring that the compression fittings if used are correctly refitted...

Страница 33: ...ssure switch Is the boiler casing correctly fitted Does the pilot light NO YES NO YES Does the spark stop after pilot is lit NO Is there a gas supply to the boiler Is the pilot injector blocked YES Re...

Страница 34: ...at knob 1 079601 25 386 149 Automatic ignition printed circuit board PACTROL PCB 25 B 1 079716 27 385 861 Pressure switch HONEYWELL YAMATAKE C6065 A 1010 1 111379 28 E02 661 Fan assembly SIFAN No WFFB...

Страница 35: ...d pilot assembly 13 Main burner 14 Main burner injector 69 BURNER ASSEMBLY Exploded View LEGEND Numbers up to 51 relate to the B G spares list 20 Control box 21 Thermostat potentiometer 24 Thermostat...

Страница 36: ...36 Classic LXFF FF Installation 71 BOILER CASING ASSEMBLY SHORT LIST OF PARTS Deluxe model LX Standard model 72 SHORT PARTS LIST...

Страница 37: ...Classic LXFF FF Installation 37...

Страница 38: ...01482 492 251 Fax 01482 448 858 Registration No London 322 137 Registered Office National Avenue Kingston upon Hull HU5 4JN A subsidiary of Caradon p l c THIS SYMBOL IS YOUR ASSURANCE OF QUALITY These...

Страница 39: ...l be giving away a free boiler for the five best ideas every year to be selected by our Technical Director Please complete this form using extra sheets if required and post it or fax it to us on 01482...

Страница 40: ...to contact me Please arrange for me to join an Ideal factory tour Range guides required The Ideal Guide a specifier s and installer s introduction to the Ideal domestic boiler range The Ideal Househo...

Отзывы: