30
BOXER
combination boiler -
Installation and Servicing
SERVICING
43 EXPANSION VESSEL AND VERTICAL PROTECTION SHIELD REMOVAL
1.
Remove the casing (refer Frame 41).
2.
Lift and disconnect the two clips retaining the expansion
vessel.
3.
Lift off the expansion vessel from the protection shield and
hang it on the frame bottom.
4.
Remove the two clips retaining the vertical protection
shield and remove it (only for 24 kW).
5.
Disconnect the wiring from the ignition transformer,
remove the 3 screws securing the air guide to the main
chassis and remove the air guide (only for 28 kW).
Note.
Take care not to disturb the expansion vessel flexible pipe.
3
3
2
2
4
3
5
(
BOXER C 28
)
(
BOXER C 24
)
SER
VICING