If you have any questions, please call 1-800-558-4435
ICWUSA.com, Inc.
If you have any questions, please call 1-800-558-4435
ICWUSA.com, Inc.
Page 2 of 5
VT21 insTallaTion
Wire management showing
split wire loom.
Wire management when
stowed.
VT21 INSTALLATION - rev 10/6/15 pjm
REPlaCE RiGHT CoVER PlaTE
Replace right cover
plate and end caps.
Replace
end cap
screws
REMoVE RiGHT CoVER PlaTE
•
Remove both top and
bottom end caps.
•
Grasp inside edge of
RIGhT SIDE cover
plate and rotate outward
to remove, exposing
wire management area.
•
DO NOT remove left
side cover plate.
Remove
end cap
screws
WiRE ManaGEMEnT
•
While monitor is face
down on the keyboard
tray, plug wires into
monitor and keyboard.
•
Gather wires and insert
into split wire loom.
Wrap excess wire onto
cord clips.
•
Insert monitor wire loom
into middle slot of main
assembly.
•
Insert keyboard wire
loom into lower slot.
•
Secure wire loom with
provided zip ties.
Middle
slot
Cord
clip
Zip tie
mount
Lower
slot
loWER KEYBoaRD
Use actuator handle to
lower keyboard downward
so keyboard just clears
bottom of unit. Top of
keyboard should be 1 to 2”
below unit.
Actuator
handle
Lay monitor face
down on top of
keyboard tray.