© 2022 ICS, Oregon Tool Inc.
F/N 51873
Feb 22
TITLE
ICS
®
RZ60C OPERATOR’S MANUAL
18
OPERATION
PRE-CUT CHECKLIST
• Ensure proper belt tension.
• Ensure the blade is mounted correctly.
• Ensure all safety devices are properly mounted and functional and that all controls are in proper
working order.
• Be sure there are no obstructions (plumbing, electrical conduit, air ducts).
• Always wear protective clothing, including hard hat, eye protection, hearing protection, non-slip
safety boots, gloves, and avoid wearing loose fitting clothing.
PLANNING THE CUT
• Outline the cut with a permanent marker for a visual cutting guide.
• Avoid pinching the blade. Always cut the bottom of an opening first, then top, and then the sides.
Save the easiest cut for last.
• For the straightest cuts use the “Step Cut” method. First score the entire cut line approximately a
half-inch deep. Next, deepen the cut by about two inches. Then complete the cut.
• Be sure cut concrete cannot fall and injure operator or bystanders. Concrete is very heavy, one
cubic foot = 12” x 12” x 12” = 150 lbs. (30 cm x 30 cm x 30 cm = 68 kg).
WARM ENGINE STARTING PROCEDURE
Use the same procedure as starting cold engine, but
DO NOT pull choke lever out
. If choke is
used, the carburetor will flood with gas.
If the engine does not start in 3 hard, fast pulls with the throttle locked, unlock the throttle and pull
the starter cord 3 more times.
Содержание RZ60C
Страница 1: ...2022 ICS Oregon Tool Inc RZ60C OPERATOR S MANUAL...
Страница 2: ......
Страница 30: ......
Страница 31: ......