background image

 

GW-2139M (Modbus TCP to BACnet MS/TP Gateway) User Manual 

Version 1.0.0 

Page

10

 

 

Copyright ©  2019 ICP DAS Co., Ltd. All Rights Reserved    E-mail: [email protected] 

2.3  LED Indicator 

There  are  six  LEDs  to  indicate  the  various  states  of  the  GW-2139M.  The  following  is  the 

illustration of these six LEDs. 

 

Figure 2.1 LED position of the GW-2139M 

LED Name  GW-2139M Status 

LED Status 

ALL LEDs 

FW Updating Mode 

LED will be twinkled sequentially. 

PWR 

(Module) 

Power On 

On 

Power Failure 

Off 

NET 

(MSTP) 

Connect  at  least  one 

device 

On 

No 

devices 

are 

connected 

Blink per 200 ms 

STA 

(MSTP) 

Connect all device 

On 

Some  devices  are  not 

connected 

Blink per 200 ms 

CNT 

(Modbus) 

Connected  by  least  one 

client. 

On 

No clients connect 

Blink per 200 ms 

RxD 

(Modbus) 

Data reception 

On 

No Data reception 

Off 

TxD 

(Modbus) 

Data transmission 

On 

No Data reception 

Off 

Table 2.1 LED indication of the GW-2139M 

STA 

NET 

PWR 

TxD 

RxD 

CNT 

Содержание GW-2139M

Страница 1: ...User Manual Version 1 0 0 February 2019 GW 2139M BACnet MS TP to Modbus TCP Gateway Written by Ives Shen...

Страница 2: ...m Table of Contents 1 General Information 4 1 1 BACnet MS TP Introduction 4 1 2 Modbus TCP Introduction 4 1 3 About GW 2139M 5 1 4 Features 6 1 5 Specifications 7 2 Hardware 8 2 1 Size Unit mm 8 2 2 A...

Страница 3: ...reserves the right to change this manual at any time without notice The information furnished by ICP DAS is believed to be accurate and reliable However no responsibility is assumed by ICP DAS for it...

Страница 4: ...m of a pulse signal that is passed between devices on a network BACnet MS TP is exclusive to BACnet and can be implemented using the EIA 485 signaling standard This is a shielded twisted pair STP LAN...

Страница 5: ...S TP master The BACnet Master Slave Token Passing MS TP protocol is used to relay and exchange information between building devices GW 2139M contains a large number of BACnet objects AI AO AV BI BO BV...

Страница 6: ...rd BACnet objects via Modbus Configurable BACnet MS TP master Configurable Modbus TCP server Simple data translation allows you to manipulate data Supports BACne AI AO AV BI BO BV MSI MSO MSV Object T...

Страница 7: ...bled disabled via Jump Isolation 3 kV VDC for DC to DC 2500 Vrms for photo couple Protocol BACnet MS TP Master Maximum Connections 32 BACnet Objects AI AO AV BI BO BV MSI MSO MSV BIBBs DS RP A DS RPM...

Страница 8: ...BACnet MS TP Gateway User Manual Version 1 0 0 Page 8 Copyright 2019 ICP DAS Co Ltd All Rights Reserved E mail service icpdas com 2 Hardware 2 1 Size Unit mm Top view Right view Front view Bottom vie...

Страница 9: ...or Ethernet Port Terminal Block The GW 2139M is equipped with a RJ45 port for Ethernet LAN connection When 100BASE TX is operating the 10 100M LED is lit orange When 10BASE T is operating or the machi...

Страница 10: ...GW 2139M Status LED Status ALL LEDs FW Updating Mode LED will be twinkled sequentially PWR Module Power On On Power Failure Off NET MSTP Connect at least one device On No devices are connected Blink p...

Страница 11: ...bout wiring Please follow Figure 2 1 wiring diagram to wire the following items 1 Power Supply 10 VDC 30 VDC 2 RS 485 D D MSTP wiring 3 RS 232 TxD RxD GND Debug Port N 8 1 115200 baud rate 4 Ethernet...

Страница 12: ...Reserved E mail service icpdas com 3 2 GW 2139M Utility Please change the GW 2139M to initial mode and follow the following steps to set up the communication between the utility and the GW 2139M Step0...

Страница 13: ...t MS TP Gateway User Manual Version 1 0 0 Page 13 Copyright 2019 ICP DAS Co Ltd All Rights Reserved E mail service icpdas com Step3 Set the module network parameter Step4 Select the DO DI AO or AI pag...

Страница 14: ...Gateway User Manual Version 1 0 0 Page 14 Copyright 2019 ICP DAS Co Ltd All Rights Reserved E mail service icpdas com Step5 Add the one item to mapping table of the page Step6 Delete the one item from...

Страница 15: ...age 15 Copyright 2019 ICP DAS Co Ltd All Rights Reserved E mail service icpdas com Step7 Delete all items from mapping table of the page Step8 Write Read the all configuration to the module Step9 Plea...

Страница 16: ...Tool FW_Update_Tool on the GW 2139M product page and store it in a computer that you want to connect to GW 2139M Update Tool Please refers to http www icpdas com root product solutions industrial_comm...

Страница 17: ...for connecting to GW 2139M In Firmware Path select the latest firmware update file GW2139M_xxxx fw In Firmware Update click Update to start the firmware updating 4 When the update is completed Update...

Отзывы: