16
16. Set the Left Handrail Cover (70) on the left
Handrail (72). Start two #8 x 3/4" Screws (11)
into the left Handrail and the Left Handrail Cover.
Next, slide the Left Handrail Cover forward
against the console assembly (G) as shown.
Then, tighten both Screws.
Then, attach the Left Handrail Bottom (14) to the
Handrail (72) with two #8 x 3/4" Screws (11).
Attach the Right Handrail Cover (71) and
the Right Handrail Bottom (12) to the right
Handrail (72) as described above.
11
11
16
72
12
14
72
71
70
G
11
11
17
17. Orient the Storage Latch (52) as shown. Attach
the Storage Latch to the Left Upright (78) with
two #10 x 3/4" Screws (9).
Do not overtighten
the Screws.
52
9
78
Содержание PRO-FORM COACHLINK T 9.0
Страница 5: ...5 all STANDARD SERVICE PLANS...