12
9.
Carefully slide the Upright Crossbar (77)
between the Left and Right Uprights (78, 79).
Attach the Upright Crossbar with the four 5/16" x
3/4" Screws (13) that you removed in step 6
and four 5/16" Star Washers (7);
start all four
Screws, and then tighten them.
9
7
13
13
7
78
79
77
8. Attach the other Handrail (72) to the Left Upright
(78) with two 5/16" x 2" Screws (5) and two 5/16"
Star Washers (7);
start both Screws, and then
tighten them.
Then, remove and discard the two indicated
screws (E).
7
72
5
8
78
E
Содержание PRO-FORM COACHLINK T 9.0
Страница 5: ...5 all STANDARD SERVICE PLANS...