Installation
16
FRONT DOOR ADJUSTMENT
a
DANGER
Incorrect door adjustment with consequent damage to people and property voids the warranty conditions.
DOOR ADJUSTMENT (OPENING ON THE RIGHT)
1
2
3
6
4
5
7
Dx
Sx
VERTICAL ADJUSTMENT
To make the adjustment:
–
with the door ajar, loosen the counter-nuts (1) of the hinge units
–
act on the adjustment nuts (2) to lift or lower the door by centring the gasket on the stop plate, then block the counter-nuts
(1)
–
close the door and centre the tie-rod (4) on the mechanical tube (5), proceeding as in the previous point.
HORIZONTAL ADJUSTMENT
Close the door using the lever and check that there is equal distance on both sides, between the stop plate and the band. If this
is not the case:
–
with the door ajar, loosen the locking nuts (6) of the hinge units
–
act on the ferrule (7) to adjust the distance depth-wise
–
screw the nuts (6) and block the conical washers on the mechanical tubes.
a
DANGER
When cross-changing ferrules, always make sure that the other two ferrules are fastened, so that they hold the door.
Check the proper adjustment in depth ensuring that the door, manually pushed up to the stop plate, naturally returns remaining
ajar. This is to ensure the hinge side fume seal.
TURBULATOR ASSEMBLY
To assemble the turbulators supplied with the boiler, open the door and insert the turbulators completely into the smoke pipes,
until they penetrate by at least 100 m.
100
mm
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz