background image

Useful information and declarations

28

DECLARATION OF CONFORMITY

ICI CALDAIE S.p.A.

Via G. Pascoli, 38 – Frazione Campagnola
37059 Zevio (VR)
Tel39 045 8738511-Fax +39 045 8731148

[email protected]

 – VAT number IT 00227490232

Company subject to management and coordination by FINLUC s.r.l.
(R.I. n. 02245640236)
Company certified according to ISO 9001, OHSAS 18001 & ISO 14001

icicaldaie.com

DECLARATION OF CONFORMITY WITH EUROPEAN 

COMMUNITY STANDARDS

The undersigned Emanuela Lucchini, CEO of ICI CALDAIE S.p.A., with registered office in 
Via G. Pascoli, 38 - 37059 Campagnola di Zevio (VR), Italy.

Declares that the boilers:

REX/REX F

REX K/REX K F

REX DUAL/REX DUAL F

conform to the type described in the EC certification and comply with the following 
Council Directives:

 

 

European Regulation on Gas Equipment GAR 2016/426/EU

 

Electromagnetic Compatibility Directive 2014/30/EU

 

Low Voltage Directive 2014/35/EU

 

Efficiency Directive 92/42/EEC

Zevio, 07/05/2018

Cooke Industries - Phone: +64 9 579 2185   Email: [email protected]   Web: www.cookeindustries.co.nz

Содержание REX 140-F

Страница 1: ...0_350_F_en_00 08 2019 EN PRESSURISED STEEL BOILERS REX 140 350 F INSTALLATION USE AND MAINTENANCE MANUAL Cooke Industries Phone 64 9 579 2185 Email sales cookeindustries co nz Web www cookeindustries...

Страница 2: ...11 Handling 11 Installation room 12 System cleaning 12 Hydraulic connections 12 Starting hydraulic circuit 12 Water circulation 13 Flue gas discharge and combustion air suction 14 Control panel insta...

Страница 3: ...ranty conditions RANGE MODEL CODE MODEL CODE REX 140 F 83813210 REX240 F 83816210 REX160 F 83813220 REX300 F 83817210 REX180 F 83814210 REX350 F 83818210 REX200 F 83815210 COMPLIANCE REX boilers compl...

Страница 4: ...ersonnel maintenance technician in compliance with the requirements of the local Standards in force Ordinary and extraordinary maintenance must be carried out by qualified personnel in order to prompt...

Страница 5: ...andards in force IDENTIFICATION Each REX boiler can be identified through the construction plate inside the envelope of the documents supplied with the boiler which includes technical efficiency infor...

Страница 6: ...helical turbulators rear smokebox made in steel metal sheet consisting of a single piece that can be easily opened to inspect the fire tubes fastened by means of bolts complete with chimney fitting a...

Страница 7: ...0 3225 P3 mm 831 831 771 903 903 903 903 P4 mm 1300 1300 1850 1550 1950 2050 2050 P5 mm 755 755 475 767 627 527 982 P6 mm 350 400 350 400 450 500 450 500 450 500 450 500 450 500 b mm 320 320 320 360 3...

Страница 8: ...urneroff 0 1 0 1 0 1 0 1 0 1 0 1 0 1 Fluegastemperature Nom output air 20 C GAS C 184 183 184 184 184 184 184 Fluegastemperature Nom output air 20 C OIL C 187 186 186 187 186 186 187 Fluegastemperatur...

Страница 9: ...magnetic Compatibility Directive 2014 30 EU Low Voltage Directive 2014 35 EU Machinery Directive 2006 42 EC for liquid fuel burners Since the optimal operation of the boiler depends on the correct sel...

Страница 10: ...ce and it MUST be carefully read before installing and commissioning the boiler carefully stored for further consultations and it MUST always accompany the boiler m IMPORTANT The control panel must be...

Страница 11: ...iance reaching the safety devices maintenance repairing any breakage opening the door of the installed burner considering its opening direction towards the right or the left It is recommended to posit...

Страница 12: ...ressure indicated on the boiler nameplate Make sure that the drains of the safety valves of the boiler and the heater if any are connected to a drain funnel so that the valves do not flood the room in...

Страница 13: ...tion and provided for by the Technical Standards in force considering a zero pressure at the connection with the smoke duct unsuitable or badly dimensioned chimneys and smoke ducts can cause condensat...

Страница 14: ...uare pipe of the support and through the upper openings route them in the protection pipe until reaching the pockets 6 Then lock with specific clamps to prevent them from being pulled out connect the...

Страница 15: ...wrench adjustable ferrules 8 these must always be mounted on the hinges to prevent the door from being accidentally opened through the lever 9 Proceed as follows to reverse the opening direction of t...

Страница 16: ...des between the stop plate and the band If this is not the case with the door ajar loosen the locking nuts 6 of the hinge units act on the ferrule 7 to adjust the distance depth wise screw the nuts 6...

Страница 17: ...2 P6 5 b 4 3 1 1 2 1 Burner 2 Flange 3 Gasket 4 Door 5 Thermoceramic material m IMPORTANT For fuel oil biogas operation the door should have concrete insulation and be equipped with suitable tie rods...

Страница 18: ...the service life of the boiler Limestone gathers in the points where the wall temperature is higher and the best defence against it at the construction level is to eliminate the superheating areas Sca...

Страница 19: ...ure back to the preset value and close the manual and or automatic supply tap After the initial filling it is necessary to prevent oxygen and untreated water from entering the system The entry of oxyg...

Страница 20: ...has been correctly built and that the fuel is available hydraulic and fuel circuit taps are open check for voltage presence at the control panel and burner The boiler will perform the ignition phase...

Страница 21: ...t considering the losses through the boiler casing Efficiency diagram significant losses only Tf Flue gas temperature in chimney C Ta Ambient temperature in C G Gas Go Diesel fuel Ho Nafta Example Flu...

Страница 22: ...the central panel switches and the control panel switch to OFF close the fuel and water interception valves of the hydraulic system m IMPORTANT If the external temperature is below ZERO empty the hea...

Страница 23: ...if any to OFF close the fuel supply use all Personal Protective Equipment required by current Standards and Legislation wait for the boiler and the system to cool down BOILER External cleaning To perf...

Страница 24: ...d replace the gasket before refitting it Once the cleaning operation is completed reassemble all the components replacing those worn out and operating by following the previous procedure in the revers...

Страница 25: ...Thermostat if any Check the efficiency Unburned material odour Flue gases dispersion into the environment Check the boiler body cleanliness Check the flue gas pipe cleanliness Check the tightness of b...

Страница 26: ...tion window 5 Complete door 6 Door 7 Door fibreglass braid 8 Isolcart insulating panels between burner and door 9 Burner nosepiece mat kit 10 Flow and return gaskets 11 Turbulators 12 Smokebox 13 Isol...

Страница 27: ...completing the indicated spaces Once registered authenticate your e mail address by clicking on the link that will be sent by e mail to the provided inbox An additional e mail will then be received wi...

Страница 28: ...EAN COMMUNITY STANDARDS The undersigned Emanuela Lucchini CEO of ICI CALDAIE S p A with registered office in Via G Pascoli 38 37059 Campagnola di Zevio VR Italy Declares that the boilers REX REX F REX...

Страница 29: ...Notes 29 6 Notes Cooke Industries Phone 64 9 579 2185 Email sales cookeindustries co nz Web www cookeindustries co nz...

Страница 30: ...Notes 30 7 Notes Cooke Industries Phone 64 9 579 2185 Email sales cookeindustries co nz Web www cookeindustries co nz...

Страница 31: ...Notes 31 Cooke Industries Phone 64 9 579 2185 Email sales cookeindustries co nz Web www cookeindustries co nz...

Страница 32: ...Campagnola di Zevio Verona Italy Via G Pascoli 38 Phone 39 0458738511 Fax 39 0458731148 info icicaldaie com www icicaldaie com Cooke Industries Phone 64 9 579 2185 Email sales cookeindustries co nz We...

Отзывы: