14
6)
Insert the 4 short staves (previously prepared with the stoppers) between the struts, on each side.
The above picture is only for reference.
7)
Insert the staves, including the one designed for the installation of the control panel.
HOW TO ASSEMBLE THE CONTROL PANEL
The control panel supplied in the boiler kit can be installed either to the right-hand side or the left-hand side
of the wall.
The panel must be fixed to the corresponding stave (1) which has pre-prepared holes for the screws and
slots for the capillary inlets.
The above picture is only for reference.
8)
Fix the control panel (2) to the supporting stave and pass the capillaries (3) through the stave slot until
they reach the bulb basins in the equipped socket (4), fitted on the boiler delivery line (inside the fur-
nace).
2
3
1
4