11
7.5 INSULATION OF THE BOILER BODY
The boiler is supplied fixed to a wooden supporting base (1) to allow handling and to facilitate the insulation
process.
The glass wool insulation, consisting of 3 layers, must be wrapped on the parts shown in the figure and fixed
to the connection sides by the appropriate clamps supplied.
The above picture is only for reference.
Once the glass wool is attached, the wooden support can be removed and the boiler can be placed in its fi-
nal position.
1
1