background image

 

 

19 

Rev. 6 

 

IQ7400HE 

 

Figure 12 

Содержание IQ10000HE

Страница 1: ...Nonhazardous Locations OPERATION AND INSTALLATION MANUAL IMPORTANT PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system Keep this ma...

Страница 2: ...9 Fan Speed Controller Ord Loc Only 9 Maintenance 11 Trouble Shooting 11 Schematic Wiring Diagram 13 Specification Drawings 14 IQ700HE 14 IQ800HE 15 IQ900HE 16 IQ2200HE 17 IQ6100HE 18 IQ7400HE 19 IQ10...

Страница 3: ...veral systems that function simultaneously to maintain environmentally friendly conditions for your equipment within the enclosure The three main thermal related systems that we employ are the closed...

Страница 4: ...changer will be 1 Operation manual 2 Mounting hardware 3 Standard master warranty 4 Enclosure gasket Storage The storage space temperature should be in the range of 40 to 85 C 40 to 185 F in a non con...

Страница 5: ...point Factory set points Enclosure 70 F Ambient 90 F Fan speed controller option available for Ord Loc Only 4 After completing the above check point the Ice Qube TMS is ready to be mounted to your enc...

Страница 6: ...unting studs through the 3 8 9 5mm or 1 2 12 7mm depending on model holes in your enclosure and check to see that all openings are aligned 3 After checking that all openings and bolt holes are in alig...

Страница 7: ...heck that wire routing to the terminal box will not interfere with or become damaged by other components Electrical Installation 1 Check that the heat exchanger designated power supply is de energized...

Страница 8: ...8 Rev 6 Figure 3 Terminal Cover Figure 4 Terminal Block optional...

Страница 9: ...e or hot and is negative or neutral the power connection is polarity sensitive Be careful when handling or adjusting the controller as all components and circuitry are at line voltage except for the a...

Страница 10: ...s set at 10 F from the factory Differential 1 2 3 5 5 Off Off Off Off 10 Off On Off On 15 On Off On Off 20 On On On On Each fan has an LED that will indicate the status of the fans Normally with power...

Страница 11: ...xcess water from the filter before returning it to the system Replace the filter if it shows signs of deterioration See website for air filter cleaning demonstration at http www iceqube com ice qube t...

Страница 12: ...rating Yes No Is the enclosure door closed tightly Yes No Are all of the gaskets in place Yes No Has the ambient warm air stream filter been cleaned or changed recently If applicable Yes No Is the sys...

Страница 13: ...13 Schematic Wiring Diagram Figure 6...

Страница 14: ...14 Rev 6 Specification Drawings IQ700HE Figure 7...

Страница 15: ...15 Rev 6 IQ800HE Figure 8...

Страница 16: ...16 Rev 6 IQ900HE Figure 9...

Страница 17: ...17 Rev 6 IQ2200HE Figure 10...

Страница 18: ...18 Rev 6 IQ6100HE Figure 11...

Страница 19: ...19 Rev 6 IQ7400HE Figure 12...

Страница 20: ...20 Rev 6 IQ10000HE Figure 13...

Страница 21: ...21 Rev 6 Gasket and Cutouts IQ700 800HE Gasket and Cutout Same Gasket and Cutout for IQ700HE and IQ800HE Figure 14...

Страница 22: ...22 Rev 6 IQ900HE Gasket and Cutout Figure 15...

Страница 23: ...23 Rev 6 IQ2200HE Gasket and Cutout Figure 16...

Страница 24: ...24 Rev 6 IQ6100HE Gasket and Cutout Figure 17...

Страница 25: ...25 Rev 6 IQ7400HE Gasket and Cutout Figure 18...

Страница 26: ...26 Rev 6 IQ10000HE Gasket and Cutout Figure 19...

Страница 27: ...ility or any other theory of liability will be limited to the lesser of customer s actual damages or the price paid by customer to Ice Qube for the Products not including applicable taxes duties and f...

Страница 28: ...es be deemed to be non binding Such advice does not relieve customer from the obligation and customer accepts full responsibility to confirm for itself the suitability of the Products for their intend...

Страница 29: ...29 Rev 6 Notes...

Отзывы: