
Installation
Considerations
CAUTION
If concrete pad is installed directly against building’s foundation, an approved expansion joint must be
installed to prevent possible noise transfer.
Ensure that roof drainage system does not undermine the Ice Bear unit’s foundation and that ALL gutters
and downspouts are properly placed and secured.
Figure 26 –Sample Precast Concrete Pad
Ice Bear
®
30 Unit Application Guide
29