Installation Considerations
Figure 22 – Minimum Clearances for Remotely Mounted Service Disconnect
CAUTION
If a concrete pad is installed directly against building’s foundation, an approved expansion joint must be
installed to prevent possible noise transfer.
Lifting
Ice Energy recommends a 10’ spreader bar in an “H” configuration with two 6’- 8’ bars running
perpendicular for lifting. Any lifting method other than this one may cause damage to the exterior
components of the unit. Ice Energy is not responsible for any damage caused by alternative lifting
techniques (i.e., damage is not covered by the product warranty). Refer to the
Ice Bear
®
30 Unit
Installation & Maintenance Guide
for details.
26 Ice
Bear
®
30 Unit Application Guide