2. Replace the protective caps on the LC-LC Fibre Channel cables.
OUT
IN
!
2 G
b/s
1 G
b/s
OU
T
IN
!
2 G
b/s
1 G
b/s
OU
T
IN
!
2 G
b/s
1 G
b/s
OUT
IN
!
2 G
b/s
1 G
b/s
OUT
IN
!
2 G
b/s
1 G
b/s
OUT
IN
!
2 G
b/s
1 G
b/s
OUT
IN
!
2 G
b/s
1 G
b/s
OUT
IN
!
2 G
b/s
1 G
b/s
Mini hub
Host mini-hub
ports
SFP module
SFP module
Fiber-optic
interface cable
Drive mini-hub
ports
3. To remove the SFP module from the mini hub, do the following:
Attention:
To avoid damage to the cable or SFP module, make sure you
unplug the LC-LC Fibre Channel cable
before
you remove the SFP module.
a. Unlock the SFP module latch by pulling the plastic tab outward 10°, as
shown in Figure 46. Pull the failed SFP module from the mini hub.
b. With the SFP latch is in the unlocked position, slide the SFP module out the
mini-hub port.
Protective cap
SFP module
10
o
Plastic tab
c. Replace the protective cap on the SFP module.
Attention:
When you handle static-sensitive devices, take precautions to
avoid damage from static electricity. For details about handling static-sensitive
devices, see “Handling static-sensitive devices” on page 35.
4. Unpack the new SFP module.
Figure 45. Replacing a failed SFP module
Figure 46. Unlocking the SFP module latch
54
IBM
®
TotalStorage
™
FAStT700 Fibre Channel Storage Server: User’s Guide
Содержание TotalStorage FAStT700
Страница 1: ...IBM TotalStorage FAStT700 Fibre Channel Storage Server User s Guide...
Страница 2: ......
Страница 3: ...IBM TotalStorage FAStT700 Fibre Channel Storage Server User s Guide...
Страница 8: ...vi IBM TotalStorage FAStT700 Fibre Channel Storage Server User s Guide...
Страница 10: ...viii IBM TotalStorage FAStT700 Fibre Channel Storage Server User s Guide...
Страница 16: ...xiv IBM TotalStorage FAStT700 Fibre Channel Storage Server User s Guide...
Страница 32: ...Figure 19 Ethernet interface ports 14 IBM TotalStorage FAStT700 Fibre Channel Storage Server User s Guide...
Страница 96: ...78 IBM TotalStorage FAStT700 Fibre Channel Storage Server User s Guide...
Страница 99: ......