background image

LIFTING HAZARD

CAUTION

To reduce the weight of a disk shelf to

approximately 53 lbs (24 kg), remove

all the IOMs and power supplies

before lifting.

A disk shelf containing the two IOMs,

four power supplies, and four disk

carriers weighs 82 lbs (37 kg).

exn30006

CAUTION:
An EXN3200 containing two IOMs, four power supplies, and four disk carriers weighs 37
kg (82 lbs). Use two people to lift an EXN3200 into a rack. To make the unit lighter and
easier to move, remove the power supplies and IOMs, noting the location of each
component for reinstallation. Do not remove the disk drives or drive blank covers to
reduce the weight. After the unit is installed in the rack, reinsert the power supplies and
IOMs.

1.

Remove the EXN3200 front bezel.

2.

From the front of the rack, place the EXN3200 onto the rails and slide it in until the front mounting
bracket of the unit is flush with the frame rails of the rack.

Attention:

The EXN3200 ships with IOMs, power supplies, and four disk carriers installed in the

storage expansion unit. The four disk carriers contain the Data ONTAP root volume. Best practice is
to leave the disk carriers in the storage expansion unit when installing the EXN3200.

3.

At the front of the rack, using four silver pan head M5 screws, that come with the rail kit, in the H5
and H10 holes, secure the EXN3200 to the rack by threading the screws through the system unit
bracket and the rack frame rail into the threaded rail nuts. Tighten the screws using a flat-bladed
screwdriver.

4.

From the rear of the rack, use silver pan head M5 screws

2

that come with the tie-down bracket to

attach the tie-down bracket

1

to the rack on each rail, as shown in Figure 6.

5.

Carefully insert the remaining disk carriers into the EXN3200 using two hands.

Note:

Do not place hands on the disk drive boards exposed on the underside of the disk carrier.

1

2

exn32020

Figure 6. Attaching the tie-down bracket to the rack

4

Содержание System Storage EXN3200

Страница 1: ...IBM System Storage EXN3200 Storage Expansion Unit Installation and Setup Instructions GC27 4217 00...

Страница 2: ...Business Machines Corporation in the United States other countries or both A complete and current list of other IBM trademarks is available on the web at www ibm com legal copytrade shtml Data ONTAP N...

Страница 3: ...IBM 19 inch rack 1 Installing the EXN3200 in the rack 3 Connecting power to the EXN3200 5 Setting the storage expansion unit shelf IDs 5 Cabling the EXN3200 6 Alternate Control Path ACP capability 6 C...

Страница 4: ...iv...

Страница 5: ...system adapters or any electrical outlets until you have reviewed the safety information and followed the procedures in this document Need help If you encounter any difficulties while setting up your...

Страница 6: ...ew of the EXN3200 storage expansion unit Refer to the following figures to familiarize yourself with the EXN3200 storage expansion unit 1 Bezel 4 Shelf activity LED 2 Shelf power LED 5 Two digit shelf...

Страница 7: ...the lower right position 1 IOM fault LED 2 ACP ports 3 Two I O modules IOM6 4 SAS ports 5 SAS port link LEDs 6 IOM A and power supplies one and two 7 IOM B and power supplies three and four 8 Four pow...

Страница 8: ...viii...

Страница 9: ...isk shelf to approximately 53 lbs 24 kg remove all the IOMs and power supplies before lifting A disk shelf containing the two IOMs four power supplies and four disk carriers weighs 82 lbs 37 kg exn300...

Страница 10: ...k position the right hand rail into the rack at the appropriate EIA location make sure that the two locating pins seat properly The bottom of the rail should line up with the bottom EIA boundary Right...

Страница 11: ...e four rail adjustment screws on the installed rail 5 Repeat steps 2 through 5 for the left hand rail 6 Repeat steps 1 through 6 for each additional EXN3200 that you are installing in the rack making...

Страница 12: ...t is flush with the frame rails of the rack Attention The EXN3200 ships with IOMs power supplies and four disk carriers installed in the storage expansion unit The four disk carriers contain the Data...

Страница 13: ...IDs A unique shelf ID is required for each SAS storage expansion unit within the entire storage system A valid EXN3200 storage expansion unit shelf ID is 00 98 Note N3400 and N3600 systems have an int...

Страница 14: ...hich makes the first connections to the N series controller and to the last or ending shelf in a stack For SAS and ACP cabling rules and for more cabling configurations see the IBM System Storage N se...

Страница 15: ...n in Figure 8 2 Cable the first shelf connections as shown in Figure 9 3 Cable the last shelf connections as shown in Figure 10 on page 8 Controller 1 ACP SAS Stack 1 ACP SAS Stack 2 IOM A IOM B Ether...

Страница 16: ...ack 1 ACP SAS Stack 2 IOM A IOM B Ethernet port B A C D HBA 1 B A C D HBA 2 exn30010 Figure 10 Cable the last shelf connections Controller 1 ACP SAS Stack 1 ACP SAS Stack 2 IOM A IOM B Ethernet port B...

Страница 17: ...s as shown in Figure 13 3 Cable the last shelf connections as shown in Figure 14 on page 10 ACP SAS Stack 1 ACP SAS Stack 2 IOM A IOM B Controller 2 Ethernet port B A C D HBA 1 B A C D HBA 2 Controlle...

Страница 18: ...the Data ONTAP Software Setup Guide for 7 Mode for the setup worksheet and other setup information ACP SAS Stack 1 ACP SAS Stack 2 IOM A IOM B Controller 2 Ethernet port B A C D HBA 1 B A C D HBA 2 C...

Страница 19: ......

Страница 20: ...Part Number 35P1601 Printed in USA GC27 4217 00 1P P N 35P1601...

Отзывы: