Figure 116. Secure power cables
Important: Always secure each power cable with a cable retainer and ensure that the cable is
installed along one of the cable management arms. When secured, the power and SAS cables stay
connected when you slide the expansion enclosure out of the rack to perform service tasks.
Figure 117. Power and SAS cable connections on the back of the enclosure
3. Verify that the expansion enclosure and its components are operating as expected.
On the back of the expansion enclosure, all four fans and the expansion canister indicators (
3
and
8
in Figure 118 on page 111) become active when the power is connected.
110 Storwize V5000 Gen2: Quick Installation Guide
Содержание Storwize V5000 Gen2
Страница 1: ...IBM Storwize V5000 Gen2 Quick Installation Guide IBM...
Страница 5: ...Index 149 v...
Страница 6: ...vi...
Страница 156: ...130 Storwize V5000 Gen2 Quick Installation Guide...
Страница 164: ...138 Storwize V5000 Gen2 Quick Installation Guide...
Страница 166: ...140 Storwize V5000 Gen2 Quick Installation Guide...
Страница 168: ...142 Storwize V5000 Gen2 Quick Installation Guide...
Страница 177: ......
Страница 178: ...IBM...