Chapter 2. Installing the hardware
After verifying that you have all of the hardware components that you require,
you can install them.
You have completed the initial steps of verifying the shipping contents and
becoming familiar with the hardware components. You have verified that the
power and environmental requirements are met and have planned the location of
the enclosures. You are now ready to begin installing the hardware components
and connecting the data cables and power cords.
Installing the support rails
Before installing an enclosure, you must first install support rails.
Procedure
To install the support rails, complete the following steps.
1.
Locate the rack mounting rails and screws (Figure 6). The rail assembly
consists of two rails that must be installed in the rack cabinet.
2.
Remove the springs that are taped to one of the rails.
v3500168
Figure 6. Rack mounting rails and screws
© Copyright IBM Corp. 2012, 2013
11
|
Содержание Storwize V3700
Страница 1: ...IBM Storwize V3700 Quick Installation Guide GC27 4219 01...
Страница 4: ...iv Storwize V3700 Quick Installation Guide...
Страница 6: ...vi Storwize V3700 Quick Installation Guide...
Страница 8: ...viii Storwize V3700 Quick Installation Guide...
Страница 14: ...xiv Storwize V3700 Quick Installation Guide...
Страница 30: ...10 Storwize V3700 Quick Installation Guide...
Страница 64: ...44 Storwize V3700 Quick Installation Guide...
Страница 78: ...f2c00790 58 Storwize V3700 Quick Installation Guide...
Страница 81: ......
Страница 82: ...Part Number 00AR171 Printed in USA GC27 4219 01 1P P N 00AR171...