Procedure
1.
Clip and remove the cable ties
(A)
that secure the power supplies and control canisters to the
shipping bracket.
Note:
Ensure that you do not clip any cables.
2.
Remove the two screws
(B)
that attach the bracket to the rack. See Figure 7 on page 8.
3.
Loosen the three tension screws
(C)
on the shipping bracket.
Figure 6. Cable ties
Installing and configuring the system
7
Содержание PureFlex System
Страница 1: ...PureFlex System Installing and configuring IBM PureFlex System GI11 9880 02...
Страница 2: ......
Страница 3: ...PureFlex System Installing and configuring IBM PureFlex System GI11 9880 02...
Страница 6: ...iv PureFlex System Installing and configuring IBM PureFlex System...
Страница 34: ...22 PureFlex System Installing and configuring IBM PureFlex System...
Страница 44: ...32 PureFlex System Installing and configuring IBM PureFlex System...
Страница 45: ......
Страница 46: ...Part Number 00L5196 Printed in USA GI11 9880 02 1P P N 00L5196...