3.
Lift the blue release latches (1) on the slide rails and push the server (2) all the way into the rack until
it clicks into place.
Installing the cable-management arm
The cable-management arm is used to efficiently route cables so that you have proper access to the rear
of the system. Use the procedure to install the cable-management arm.
To install the cable-management arm, complete the following steps:
1.
Ensure that you have the following parts.
Item Description
▌A▐
Support arm
▌B▐
Cable-management stop bracket
▌C▐
Mounting bracket
▌D▐
Cable-management arm
▌E▐
Extension bracket
1
2
3
4
5
P8EG1502-0
Figure 7. Extending slide rails and aligning server nail heads with the slots on the rail
2
P8EG1501-0
1
Figure 8. Install the server into the rack
Installing the IBM Power System S812 (8284-21A)
7
Содержание Power System 8284-21A
Страница 1: ...Power Systems Installing the IBM Power System S812 8284 21A GI11 9925 00 IBM ...
Страница 2: ......
Страница 3: ...Power Systems Installing the IBM Power System S812 8284 21A GI11 9925 00 IBM ...
Страница 6: ...iv Power Systems Installing the IBM Power System S812 8284 21A ...
Страница 16: ...xiv Power Systems Installing the IBM Power System S812 8284 21A ...
Страница 60: ...44 Power Systems Installing the IBM Power System S812 8284 21A ...
Страница 61: ......
Страница 62: ...IBM Part Number 01LK518 Printed in USA GI11 9925 00 1P P N 01LK518 ...