For copying system files to the boot device, you must have the following:
v
You must have the blank replacement boot device you received from your
provider
v
You must have a network interface to the HA pair partner node
v
You must have a separate IP address to use to netboot the target node
About this task
The following procedure is written with the assumption that the target node has
been take over by the partner node and that the target node has booted to the
firmware prompt after the takeover has completed.
Procedure
1.
Download and extract the
netboot.tgz
file from the IBM N series support
website, which is accessed and navigated as described in “Websites” on page
xxii. This file is used for performing a netboot of your system. Download the
file contents to a web-accessible directory. To download the file, complete the
following substeps:
a.
Download the
netboot.tgz
file from the IBM N series support site to the
web-accessible directory.
b.
Change to the web-accessible directory.
c.
Extract the contents of the
netboot.tgz
file to the target directory by
entering the following command:
tar -zxvf netboot.tgz
Your directory listing should contain the following directory:
netboot/
2.
Download the
image.tgz
file from the IBM N series support website to the
web-accessible directory. Your directory listing should contain the following
file and directory:
image.tgz
netboot/
3.
If you are not already grounded, properly ground yourself.
4.
Turn the controller module so that you can locate the boot device enclosure.
Use the FRU map on the controller module to help you locate the boot device
enclosure.
5.
Open the boot device cover, if applicable.
6.
Align the boot device with the boot device socket or connector, and then
firmly push it into the socket or connector.
7.
Check the boot device to make sure that it is seated squarely and completely
in the socket or connector, and reseat the boot device, if necessary.
8.
Close the boot device cover.
9.
Align the end of the controller module with the opening in the chassis, and
then gently push the controller module halfway into the system.
10.
Reinstall the cable management arms and recable the system, as needed.
When recabling, remember to reinstall the media converters (SFPs) if you are
using fiber cables.
11.
Push the controller module all the way into the system, firmly pushing the
cam handle to finish seating it, push the cam handle to the closed position
and then tighten the thumbscrew.
72
IBM System Storage: N6200 Series Hardware and Service Guide
Содержание N6270
Страница 12: ...xii IBM System Storage N6200 Series Hardware and Service Guide...
Страница 16: ...xvi IBM System Storage N6200 Series Hardware and Service Guide...
Страница 18: ...xviii IBM System Storage N6200 Series Hardware and Service Guide...
Страница 20: ...xx IBM System Storage N6200 Series Hardware and Service Guide...
Страница 46: ...20 IBM System Storage N6200 Series Hardware and Service Guide...
Страница 130: ...104 IBM System Storage N6200 Series Hardware and Service Guide...
Страница 134: ...108 IBM System Storage N6200 Series Hardware and Service Guide...
Страница 146: ...120 IBM System Storage N6200 Series Hardware and Service Guide...
Страница 147: ......
Страница 148: ...Printed in USA GA32 0838 04...