2.
Locate the hardware that is used to install the rails, including two rail springs,
two sets of eight bracket pins, and two M5 screws. Set the hardware aside for
use later in the installation process.
3.
Install a spring on each rail.
a.
Extend the rail to its full length.
b.
Push one looped end of a spring over one stud on the inside of the rail.
Note:
Some models of rail have the studs on the outside of the rail.
c.
Stretch the spring slightly and push the other looped end of the spring
onto the other stud on the inside of the rail.
4.
Working at the front of the rack cabinet, identify the two standard rack units
(2U) of space in the rack into which you want to install the support rails.
Figure 34 on page 31 shows two rack units with the front mounting holes
identified.
fab10052
Figure 33. Installing the rail spring
30
SAN Volume Controller: Model 2145-SV1 Hardware Installation Guide
Содержание MTM 2145-12F
Страница 8: ...viii SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 26: ...xxvi SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 72: ...38 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 192: ...158 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 194: ...160 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 196: ...162 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 200: ...166 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 208: ...174 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 212: ...178 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 213: ......
Страница 214: ...IBM Printed in USA GI13 4547 02...